![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_738.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | E2F/DP | ||||||||
| Protein Properties | Length: 157aa MW: 17720.2 Da PI: 5.0597 | ||||||||
| Description | E2F/DP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | E2F_TDP | 61.4 | 1.3e-19 | 17 | 75 | 28 | 71 |
E2F_TDP 28 nevakeLvse................dvknkrRRiYDilNVLealnliekkekneirwkg 71
+ va+eLv+e d+kn+rRR+YD+lNVL+a+++i+k +k+ei+wkg
evm.model.supercontig_738.1 17 SYVADELVAEfadpgssgtspdqqqyDEKNIRRRVYDALNVLMAMDIISK-DKKEIQWKG 75
679***********************************************.*******98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM01372 | 5.8E-13 | 2 | 75 | IPR003316 | E2F/DP family, winged-helix DNA-binding domain |
| Pfam | PF02319 | 1.2E-16 | 15 | 75 | IPR003316 | E2F/DP family, winged-helix DNA-binding domain |
| SuperFamily | SSF46785 | 1.77E-14 | 15 | 76 | IPR011991 | Winged helix-turn-helix DNA-binding domain |
| Gene3D | G3DSA:1.10.10.10 | 3.0E-29 | 17 | 81 | IPR011991 | Winged helix-turn-helix DNA-binding domain |
| SMART | SM01138 | 4.5E-8 | 82 | 157 | IPR014889 | Transcription factor DP, C-terminal |
| SuperFamily | SSF144074 | 6.8E-20 | 82 | 146 | No hit | No description |
| Pfam | PF08781 | 2.7E-18 | 83 | 144 | IPR014889 | Transcription factor DP, C-terminal |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0005667 | Cellular Component | transcription factor complex | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 157 aa Download sequence Send to blast |
MRKLIVRPTQ ATGSEASYVA DELVAEFADP GSSGTSPDQQ QYDEKNIRRR VYDALNVLMA 60 MDIISKDKKE IQWKGLPRTS LSDIEELKAE RLGLRNKIEK KAAYLQELED QYIGLQNLIQ 120 RNEQLYSSEN APSGGVALPF ILVQLRTLFG GLLAYKE |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1cf7_B | 3e-20 | 19 | 80 | 34 | 93 | PROTEIN (TRANSCRIPTION FACTOR DP-2) |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Involved in the regulation of the G1/S transition. Increases the DNA binding activity of E2F proteins after heterodimerization. The complex DPB/E2FC restricts cell division and lateral root initiation and may function as a negative regulator of E2F-regulated genes. The interaction with SKP2A is controlled by auxin. {ECO:0000269|PubMed:11891240, ECO:0000269|PubMed:16920782}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_738.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901808.1 | 1e-86 | transcription factor-like protein DPB | ||||
| Swissprot | Q9FNY2 | 5e-76 | DPB_ARATH; Transcription factor-like protein DPB | ||||
| TrEMBL | A0A2I4ECM3 | 8e-79 | A0A2I4ECM3_JUGRE; transcription factor-like protein DPB isoform X2 | ||||
| STRING | evm.model.supercontig_738.1 | 1e-110 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6139 | 26 | 41 | Representative plant | OGRP2511 | 17 | 34 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G03415.1 | 2e-78 | Transcription factor DP | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_738.1 |




