![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_78.15 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | TALE | ||||||||
| Protein Properties | Length: 372aa MW: 42196.9 Da PI: 7.1881 | ||||||||
| Description | TALE family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 26.4 | 1.1e-08 | 306 | 344 | 18 | 54 |
HHHH..SSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHH CS
Homeobox 18 lFek..nrypsaeereeLAkklgLterqVkvWFqNrRak 54
+F++ ++yp+ +e+ LA k gLt +qV++WF N R +
evm.model.supercontig_78.15 306 MFHNflHPYPKDAEKHLLAVKSGLTRSQVSNWFINARVR 344
5776679******************************88 PP
| |||||||
| 2 | BELL | 77.5 | 2e-25 | 186 | 254 | 3 | 72 |
BELL 3 qelqkkkakLlslleeVdkrYkqyveqlqtvissFeavaglgsakpYtslAlkaiSrhFrcLkdaiaeqi 72
+ +q kk++Ll+ll+ V+++Y+q+ +++tv+s+F+a+++l++ ++++++Al++iS +++L+d+i++qi
evm.model.supercontig_78.15 186 RPVQTKKTQLLTLLQVVEDQYNQCLGEIHTVVSAFHAATELDP-QLHARFALQTISLLYKNLRDRIISQI 254
5689***************************************.*************************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00574 | 1.7E-19 | 127 | 252 | IPR006563 | POX domain |
| Pfam | PF07526 | 2.0E-22 | 132 | 250 | IPR006563 | POX domain |
| PROSITE profile | PS50071 | 10.965 | 285 | 348 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 1.97E-10 | 288 | 349 | No hit | No description |
| Gene3D | G3DSA:1.10.10.60 | 1.9E-25 | 288 | 359 | IPR009057 | Homeodomain-like |
| SMART | SM00389 | 9.7E-6 | 288 | 352 | IPR001356 | Homeobox domain |
| SuperFamily | SSF46689 | 1.21E-15 | 289 | 357 | IPR009057 | Homeodomain-like |
| Pfam | PF05920 | 1.2E-14 | 305 | 344 | IPR008422 | Homeobox KN domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0008285 | Biological Process | negative regulation of cell proliferation | ||||
| GO:0009640 | Biological Process | photomorphogenesis | ||||
| GO:0010073 | Biological Process | meristem maintenance | ||||
| GO:0010227 | Biological Process | floral organ abscission | ||||
| GO:0010228 | Biological Process | vegetative to reproductive phase transition of meristem | ||||
| GO:0010371 | Biological Process | regulation of gibberellin biosynthetic process | ||||
| GO:0090470 | Biological Process | shoot organ boundary specification | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 372 aa Download sequence Send to blast |
MEKNILNVRV DGMELQGDSN LLPTIFDSQQ LTSLSNIQQN SHQLPPSLYT ILASNQLLSD 60 FNTKFAAPSP AFQLNPAMPY LSPTPFSSYT NELSLSLATS HPAVISDHSS AAATSWNSCN 120 SNEISVPQFS QVILGSTYLQ AIQEILAQIA TYSLENSHEP SCLIDRIGIN PFSSERGMPW 180 RDIETRPVQT KKTQLLTLLQ VVEDQYNQCL GEIHTVVSAF HAATELDPQL HARFALQTIS 240 LLYKNLRDRI ISQILELGSD PWKPEKEGIL DNCFIQEQLK RKKHHQLWRP QRGLPEKSVS 300 VLRAWMFHNF LHPYPKDAEK HLLAVKSGLT RSQVSNWFIN ARVRLWKPMI EEMYAEMNRR 360 KGGRNEEGDH R* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 3k2a_A | 6e-14 | 294 | 352 | 5 | 63 | Homeobox protein Meis2 |
| 3k2a_B | 6e-14 | 294 | 352 | 5 | 63 | Homeobox protein Meis2 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor which may be involved in the signal transduction pathway downstream of the COP1 gene. Controls floral competency as a specific activator of FLC expression. Is responsive of the nuclear import of SHOOT MERISTEMLESS (STM). {ECO:0000269|PubMed:17908157}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_78.15 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By light. In etiolated seedlings, maximally expressed after 3 days of illumination. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894865.1 | 0.0 | homeobox protein ATH1 | ||||
| Refseq | XP_021894866.1 | 0.0 | homeobox protein ATH1 | ||||
| Swissprot | P48731 | 1e-100 | ATH1_ARATH; Homeobox protein ATH1 | ||||
| TrEMBL | A0A2I4HSQ2 | 1e-115 | A0A2I4HSQ2_JUGRE; homeobox protein ATH1-like | ||||
| STRING | evm.model.supercontig_78.15 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM8228 | 26 | 37 | Representative plant | OGRP133 | 16 | 172 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G32980.1 | 1e-93 | homeobox gene 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_78.15 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




