![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_786.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ZF-HD | ||||||||
| Protein Properties | Length: 93aa MW: 9963.11 Da PI: 8.6143 | ||||||||
| Description | ZF-HD family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | ZF-HD_dimer | 105.8 | 2.7e-33 | 23 | 79 | 3 | 60 |
ZF-HD_dimer 3 kvrYkeClkNhAaslGghavDGCgEfmpsegeegtaaalkCaACgCHRnFHRreveee 60
+vrY eC+kNhAa++Gg+avDGC+Efm+s geeg+ al+CaACgCHRnFHRreve+e
evm.model.supercontig_786.1 23 SVRYGECQKNHAANIGGYAVDGCREFMAS-GEEGSNGALTCAACGCHRNFHRREVETE 79
79**************************9.999*********************9986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF04770 | 1.0E-30 | 24 | 76 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| TIGRFAMs | TIGR01566 | 3.9E-27 | 25 | 76 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| ProDom | PD125774 | 5.0E-27 | 26 | 88 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| PROSITE profile | PS51523 | 25.995 | 26 | 75 | IPR006456 | ZF-HD homeobox protein, Cys/His-rich dimerisation domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0048509 | Biological Process | regulation of meristem development | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 93 aa Download sequence Send to blast |
MKKRQVVLKS GRSSTTSSSM VRSVRYGECQ KNHAANIGGY AVDGCREFMA SGEEGSNGAL 60 TCAACGCHRN FHRREVETEV VCEYSPPNSS GR* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Inhibits zinc finger homeodomain (ZHD) transcription factors by interacting with them to prevent both their nuclear localization and their DNA-binding properties. Involved in integrating signals from multiple hormones by regulating the expression of specific genes. Promotes the formation of ectopic shoot meristems on leaf margins. {ECO:0000269|PubMed:21455630}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_786.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021901030.1 | 4e-62 | mini zinc finger protein 3-like | ||||
| Swissprot | Q2Q493 | 4e-42 | MIF3_ARATH; Mini zinc finger protein 3 | ||||
| TrEMBL | B9RLZ3 | 2e-53 | B9RLZ3_RICCO; Transcription factor, putative | ||||
| STRING | evm.model.supercontig_786.1 | 1e-61 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM944 | 28 | 114 | Representative plant | OGRP91 | 16 | 237 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G18835.1 | 2e-40 | mini zinc finger | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_786.1 |




