![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_80.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 205aa MW: 23909.7 Da PI: 7.777 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 58 | 1.6e-18 | 20 | 72 | 4 | 56 |
-SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 4 RttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
+ ++t+eq++ Le+ F n+++ e++ +LA++lgL+ r+V +W+qN+Ra++k
evm.model.supercontig_80.1 20 KKRLTHEQVRLLERSFCGNKKLEPEMKVQLASQLGLPPRRVAIWYQNKRARWK 72
4579************************************************9 PP
| |||||||
| 2 | HD-ZIP_I/II | 107.1 | 1.3e-34 | 19 | 108 | 2 | 91 |
HD-ZIP_I/II 2 kkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLekev 84
+k+rl++eqv+lLE+sF ++kLepe Kv+la++Lgl pr va+W+qn+RAR+kt+ lE+dy++L+ ++++ +e+++Le++v
evm.model.supercontig_80.1 19 NKKRLTHEQVRLLERSFCGNKKLEPEMKVQLASQLGLPPRRVAIWYQNKRARWKTQSLEVDYNTLQVKLENALAEKRQLERDV 101
79********************************************************************************* PP
HD-ZIP_I/II 85 eeLreel 91
+ L+ el
evm.model.supercontig_80.1 102 RLLQVEL 108
*999887 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 1.5E-17 | 8 | 75 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 14.916 | 14 | 74 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 3.9E-16 | 16 | 78 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 7.0E-16 | 20 | 72 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 2.13E-14 | 20 | 75 | No hit | No description |
| Gene3D | G3DSA:1.10.10.60 | 2.2E-19 | 21 | 81 | IPR009057 | Homeodomain-like |
| PROSITE pattern | PS00027 | 0 | 49 | 72 | IPR017970 | Homeobox, conserved site |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009637 | Biological Process | response to blue light | ||||
| GO:0009646 | Biological Process | response to absence of light | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 205 aa Download sequence Send to blast |
MEYFHGTQQN PKQFGKLHNK KRLTHEQVRL LERSFCGNKK LEPEMKVQLA SQLGLPPRRV 60 AIWYQNKRAR WKTQSLEVDY NTLQVKLENA LAEKRQLERD VRLLQVELGK AQEMLFEFSH 120 HRQQQQQHQL MQSHHHHHHV YSNPDHHNNN GYTVMVNNCS TSNSCEDQGF SSSFHHDQDV 180 VSDEDLRLDE LYACLIGANG SSST* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_80.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894742.1 | 1e-152 | homeobox-leucine zipper protein ATHB-52-like | ||||
| TrEMBL | A0A067LF56 | 4e-60 | A0A067LF56_JATCU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_80.1 | 1e-152 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM12107 | 26 | 32 | Representative plant | OGRP129 | 16 | 189 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G53980.1 | 2e-37 | homeobox protein 52 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_80.1 |




