![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_83.75 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 413aa MW: 46098.5 Da PI: 7.8791 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 29.6 | 1.2e-09 | 122 | 143 | 5 | 26 |
--SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 5 lCrffartGtCkyGdrCkFaHg 26
C+ f+r+G C++Gd C FaHg
evm.model.supercontig_83.75 122 VCSEFRRGGGCSRGDECEFAHG 143
7********************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF90229 | 8.37E-6 | 116 | 147 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.1E-4 | 117 | 144 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 11.911 | 118 | 145 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 1.0E-5 | 121 | 145 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 1.5E-7 | 122 | 143 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 9.1E-4 | 150 | 181 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 6.484 | 153 | 177 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.6 | 153 | 176 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010187 | Biological Process | negative regulation of seed germination | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 413 aa Download sequence Send to blast |
MTTICAEQHK LLHHHHHHLK KPTIEIPPRK LLFTSNKTYD QLPSPDSPNM LNKHLPRNTP 60 TDNDSDSDSD DPYSTDHFRM YEFKVRRCTR SRSHDWTDCP FAHPGEKARR RDPRRFHYSG 120 TVCSEFRRGG GCSRGDECEF AHGVFECWLH PSRYRTEACK DGKNCKRKVC FFAHSPRQLR 180 ILPEVLGSNC TSNSYLSPIT NHIKTNGNSY SKGTPSCCCL FCRTVSESPT STLLGLSHLS 240 RSPSLSPPLS PVKERRASTA AVFSPFSRYS DRLGKKIGVG GYKEMLSELK NSLEAMTINE 300 VLSSSSPPST TSPSPLSLPG GNCSNSSSSI DVPWLEICFN GYQDFEQQKQ QLVNLSPSTP 360 IGRSGSGDLF DENFSRQHGS GDYEKILGIN NDNENGSGCP DVDLEWVNEL VM* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription repressor that functions as negative regulator of phytochrome-mediated promotion of seed germination. Inhibits seed germination by regulating the expression of gibberellic acid (GA) and abscisic acid (ABA) metabolic genes. Does not regulate the expression of the DELLA genes RGA and RGA1. Activated by PIL5, a phytochrome-interacting basic helix-loop-helix transcription factor. {ECO:0000269|PubMed:18487351}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_83.75 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894247.1 | 0.0 | zinc finger CCCH domain-containing protein 2 | ||||
| Swissprot | Q9ZWA1 | 4e-99 | C3H2_ARATH; Zinc finger CCCH domain-containing protein 2 | ||||
| TrEMBL | U5FMC6 | 1e-112 | U5FMC6_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_83.75 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2987 | 27 | 66 | Representative plant | OGRP1170 | 16 | 44 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G03790.1 | 3e-81 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_83.75 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




