![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_832.2 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | LSD | ||||||||
| Protein Properties | Length: 136aa MW: 14238.5 Da PI: 8.6617 | ||||||||
| Description | LSD family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-LSD1 | 50.2 | 4.1e-16 | 6 | 30 | 1 | 25 |
zf-LSD1 1 CggCrtlLsYPrGApsVRCalCdtV 25
CggCrtlL+Y+rGA+sVRC++C+tV
evm.model.supercontig_832.2 6 CGGCRTLLMYTRGATSVRCSCCHTV 30
************************9 PP
| |||||||
| 2 | zf-LSD1 | 46.7 | 5.2e-15 | 44 | 68 | 1 | 25 |
zf-LSD1 1 CggCrtlLsYPrGApsVRCalCdtV 25
C +Crt+L+YP+GApsV+CalC+ V
evm.model.supercontig_832.2 44 CAHCRTTLMYPYGAPSVKCALCHYV 68
**********************987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| TIGRFAMs | TIGR01053 | 1.2E-17 | 3 | 32 | IPR005735 | Zinc finger, LSD1-type |
| Pfam | PF06943 | 1.8E-13 | 6 | 30 | IPR005735 | Zinc finger, LSD1-type |
| Gene3D | G3DSA:3.30.40.10 | 9.8E-4 | 20 | 71 | IPR013083 | Zinc finger, RING/FYVE/PHD-type |
| TIGRFAMs | TIGR01053 | 3.2E-12 | 41 | 71 | IPR005735 | Zinc finger, LSD1-type |
| Pfam | PF06943 | 1.5E-13 | 44 | 68 | IPR005735 | Zinc finger, LSD1-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0000303 | Biological Process | response to superoxide | ||||
| GO:0001666 | Biological Process | response to hypoxia | ||||
| GO:0002240 | Biological Process | response to molecule of oomycetes origin | ||||
| GO:0009626 | Biological Process | plant-type hypersensitive response | ||||
| GO:0009862 | Biological Process | systemic acquired resistance, salicylic acid mediated signaling pathway | ||||
| GO:0010104 | Biological Process | regulation of ethylene-activated signaling pathway | ||||
| GO:0010310 | Biological Process | regulation of hydrogen peroxide metabolic process | ||||
| GO:0010602 | Biological Process | regulation of 1-aminocyclopropane-1-carboxylate metabolic process | ||||
| GO:0010618 | Biological Process | aerenchyma formation | ||||
| GO:0043069 | Biological Process | negative regulation of programmed cell death | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 136 aa Download sequence Send to blast |
MAQLICGGCR TLLMYTRGAT SVRCSCCHTV NLAPASNPVA HINCAHCRTT LMYPYGAPSV 60 KCALCHYVTN VGMANVRVPL PANRPNGTTA GQMPSTSTSM PHSQSQTVVV ENPMSLDESG 120 KLVSNVVVGV TTDKK* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Negative regulator of reactive oxygen-induced cell death, cold stress-induced cell death, pathogen-induced hypersensitive response (HR), basal disease resistance. May be involved in the induction of the copper/zinc superoxide dismutase CSD1 and CSD2 that detoxify accumulating superoxide before the reactive oxygen species (ROS) can trigger a cell death cascade. LSD1 and LOL1 have antagonistic effects on CSD1 and CSD2 accumulation to regulate oxidative stress-induced cell death. Antagonizes the function of BZIP10, a positive regulator of cell death, by interacting in the cytoplasm and preventing its nuclear localization. Controls lysigenous aerenchyma in hypocotyls under root hypoxia. Required for leaf acclimation in response to excess excitation energy. {ECO:0000269|PubMed:10550898, ECO:0000269|PubMed:11595797, ECO:0000269|PubMed:11844114, ECO:0000269|PubMed:12732715, ECO:0000269|PubMed:15347794, ECO:0000269|PubMed:16957775, ECO:0000269|PubMed:18055613, ECO:0000269|PubMed:18790826, ECO:0000269|PubMed:20456049, ECO:0000269|PubMed:21097903}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_832.2 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By methyl viologen. {ECO:0000269|PubMed:20456049}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021900228.1 | 1e-93 | protein LSD1 | ||||
| Refseq | XP_021900236.1 | 1e-93 | protein LSD1 | ||||
| Refseq | XP_021900244.1 | 1e-93 | protein LSD1 | ||||
| Refseq | XP_021900251.1 | 1e-93 | protein LSD1 | ||||
| Refseq | XP_021900259.1 | 1e-93 | protein LSD1 | ||||
| Refseq | XP_021900267.1 | 1e-93 | protein LSD1 | ||||
| Swissprot | P94077 | 4e-59 | LSD1_ARATH; Protein LSD1 | ||||
| TrEMBL | A0A2P5CRE2 | 5e-81 | A0A2P5CRE2_PARAD; Multihem cytochrome | ||||
| STRING | evm.model.supercontig_832.2 | 5e-94 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5345 | 26 | 50 | Representative plant | OGRP1146 | 17 | 53 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G20380.7 | 2e-61 | LSD family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_832.2 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




