![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_84.89 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 403aa MW: 45105.5 Da PI: 8.909 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 39.4 | 1.1e-12 | 335 | 380 | 6 | 55 |
HHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 6 nerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+++Er RR ri +++ +L++l+P+ +k + a++L +Av+YIk+Lq
evm.model.supercontig_84.89 335 SIAERVRRTRISERMRKLQDLVPNM----DKQTNTADMLDLAVDYIKDLQ 380
689*********************7....688*****************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 15.275 | 329 | 379 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 3.01E-16 | 332 | 389 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 6.46E-12 | 333 | 384 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 2.5E-15 | 334 | 390 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.2E-9 | 335 | 380 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 5.5E-14 | 335 | 385 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0010119 | Biological Process | regulation of stomatal movement | ||||
| GO:0042335 | Biological Process | cuticle development | ||||
| GO:0048573 | Biological Process | photoperiodism, flowering | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 403 aa Download sequence Send to blast |
MESDLHHRRH HLADHQPLYD QKPMNSGLTR YQSAPSSYFS SFSDRDFCEE FLNRPTSPET 60 ERIFARFLSA TSGNTDNAIL DQSFRDIRDS SSVKEPVREM EPQTQIMATI KTETEVLQKQ 120 NSYSSVSQSF YQTHQAQNQQ QLPNQNSGSG MDYRMETTMR MDRLPPTKTG GGNSTPNLIR 180 HSSSPAGLFA NINIDNRFGV LRGMGDFGSG NKRESSFTSA IRPPSSSSGL MQTITEMGEK 240 NMGGNSPENA GLYTVGSWDE VAILSDEIAG VKRIRDDDKA LTKNVEAASM RPPLLAHHLS 300 LPKSSAEISA IEKFFQDSVP CKIRAKRGCA THPRSIAERV RRTRISERMR KLQDLVPNMD 360 KQTNTADMLD LAVDYIKDLQ KQVKTLSDNR AKCLCSNKQQ QK* |
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00195 | DAP | Transfer from AT1G51140 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_84.89 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894141.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| Refseq | XP_021894142.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| Refseq | XP_021894143.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| Refseq | XP_021894144.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| Refseq | XP_021894145.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| Refseq | XP_021894146.1 | 0.0 | uncharacterized protein LOC110811853 | ||||
| TrEMBL | A0A061GZ59 | 1e-168 | A0A061GZ59_THECC; DNA binding protein, putative isoform 2 | ||||
| STRING | evm.model.supercontig_84.89 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM10547 | 26 | 32 | Representative plant | OGRP511 | 15 | 80 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G51140.1 | 2e-76 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_84.89 |




