![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_847.1 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bZIP | ||||||||
| Protein Properties | Length: 209aa MW: 23637.4 Da PI: 9.9067 | ||||||||
| Description | bZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | bZIP_1 | 31.9 | 2.9e-10 | 46 | 87 | 4 | 45 |
XCHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
bZIP_1 4 lkrerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaL 45
k rr+++NReAAr+sR+RKka++++Le +L++ ++L
evm.model.supercontig_847.1 46 QKTLRRLAQNREAARKSRLRKKAYVQQLESSRLKLTQLEQEL 87
6889*************************9777777666555 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.20.5.170 | 2.8E-8 | 37 | 90 | No hit | No description |
| SMART | SM00338 | 4.9E-8 | 43 | 106 | IPR004827 | Basic-leucine zipper domain |
| PROSITE profile | PS50217 | 9.415 | 45 | 89 | IPR004827 | Basic-leucine zipper domain |
| CDD | cd14708 | 8.97E-23 | 47 | 99 | No hit | No description |
| SuperFamily | SSF57959 | 2.06E-7 | 47 | 90 | No hit | No description |
| Pfam | PF00170 | 2.4E-7 | 47 | 87 | IPR004827 | Basic-leucine zipper domain |
| PROSITE pattern | PS00036 | 0 | 50 | 65 | IPR004827 | Basic-leucine zipper domain |
| Pfam | PF14144 | 7.6E-33 | 129 | 202 | IPR025422 | Transcription factor TGA like domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 209 aa Download sequence Send to blast |
MADASPRTDI STDVDTDDKY QRSNRGQSTA VVASDSSDRS KDKTDQKTLR RLAQNREAAR 60 KSRLRKKAYV QQLESSRLKL TQLEQELQRA RQQGIFISSS GDQAHSIGGN GAMAFDVEYA 120 RWLEDQNRHI NELRSAVNSH ASDTELRIIV DNIMVHYDEI FRLKSNAAKA DVFHLLSGMW 180 KTPAERCFLW LGGFRSSELL KVTSISKF* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional activator that binds specifically to the DNA sequence 5'-TGACG-3'. Recognizes ocs elements like the as-1 motif of the cauliflower mosaic virus 35S promoter. Binding to the as-1-like cis elements mediate auxin- and salicylic acid-inducible transcription. May be involved in the induction of the systemic acquired resistance (SAR) via its interaction with NPR1. Could also bind to the Hex-motif (5'-TGACGTGG-3') another cis-acting element found in plant histone promoters (By similarity). {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_847.1 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021899961.1 | 1e-153 | transcription factor TGA6-like | ||||
| Refseq | XP_021899968.1 | 1e-153 | transcription factor TGA6-like | ||||
| Swissprot | Q39140 | 1e-118 | TGA6_ARATH; Transcription factor TGA6 | ||||
| TrEMBL | A0A067KWK5 | 1e-131 | A0A067KWK5_JATCU; Uncharacterized protein | ||||
| TrEMBL | V4T813 | 1e-132 | V4T813_9ROSI; Uncharacterized protein | ||||
| TrEMBL | V4V1M9 | 1e-131 | V4V1M9_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_847.1 | 1e-152 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM667 | 28 | 133 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G12250.2 | 4e-98 | TGACG motif-binding factor 6 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_847.1 |




