![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_85.115 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 278aa MW: 30180.8 Da PI: 9.1206 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 41.3 | 2.7e-13 | 205 | 250 | 6 | 55 |
HHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 6 nerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+++Er RR ri +++ +L+el+P+ +k s a++L +AveYIk+Lq
evm.model.supercontig_85.115 205 SIAERVRRTRISERMRKLQELVPNM----DKQTSTADMLDLAVEYIKDLQ 250
689*********************7....688*****************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 15.428 | 199 | 249 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 1.83E-16 | 202 | 265 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 1.03E-12 | 203 | 252 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 1.9E-14 | 204 | 260 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 2.8E-12 | 205 | 255 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 2.8E-10 | 205 | 250 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0048573 | Biological Process | photoperiodism, flowering | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 278 aa Download sequence Send to blast |
MDSSYELLAM DHQSQGKSIS SNLIRQSSSP AGLFANLSAQ NGYATMKSVG SYGGVNGTDG 60 GGLSPSNRLK SLYSFSSRLP SSAMLSQISE IGSESIGANG HDDGKLGNGT GDARFYNPGF 120 PSGGWHNSLS FTENFSGLKQ ENDNDGKLYS GSQDGESGNR IHMLSHSLSL PKASTEMVIE 180 KFLQFQDSVP CKIRAKRGCA THPRSIAERV RRTRISERMR KLQELVPNMD KQTSTADMLD 240 LAVEYIKDLQ KQFKTLSDNR ANCKCLNTQK PIPNQII* |
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00308 | DAP | Transfer from AT2G42280 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_85.115 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894047.1 | 0.0 | transcription factor bHLH130-like | ||||
| Swissprot | Q66GR3 | 5e-91 | BH130_ARATH; Transcription factor bHLH130 | ||||
| TrEMBL | A0A1R3HIJ6 | 1e-146 | A0A1R3HIJ6_9ROSI; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_85.115 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM6293 | 27 | 45 | Representative plant | OGRP511 | 15 | 80 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G42280.1 | 7e-82 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_85.115 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




