![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_85.120 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 371aa MW: 41056.5 Da PI: 5.5811 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 26.3 | 1.3e-08 | 212 | 259 | 4 | 55 |
HHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 4 ahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+h+ +Er RR++iN ++ L+el+P + +k a +L + +++++sLq
evm.model.supercontig_85.120 212 SHSLAERARREKINARMKLLQELVPGC----NKISGTALVLDEIINHVQSLQ 259
8*************************9....888999999999999999998 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF47459 | 5.37E-15 | 206 | 277 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 4.01E-8 | 206 | 263 | No hit | No description |
| PROSITE profile | PS50888 | 14.519 | 208 | 258 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 1.3E-14 | 209 | 276 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 4.3E-6 | 212 | 259 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 2.9E-8 | 214 | 264 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 371 aa Download sequence Send to blast |
MDLIGGIIAR SSPREPEPDE TVLDSLQFNE EIHRMMAAPP ENGSSFTALL ELPATQAMEL 60 LHSSDSGNSP APRAGDDDLK HSFQSFDGTM NFPSNTALIE RAARFSLFAG EHISNNSPET 120 SSVPSNSSGN LERVKSEPAE TESSQPLVSD PAAENQSHNQ NQRSAVKRKE REKKVAKGSA 180 KKTKSAANDS SEDAEKLPYV HVRVRRGQAT DSHSLAERAR REKINARMKL LQELVPGCNK 240 ISGTALVLDE IINHVQSLQR QVEFLSMRLA TVNPRVDFNL DNILAAESGS LMDSNFPSMV 300 MPMMWPEVPV SGNRQQYQQQ QWHFDAFHQP VWGREEENHH NFTTPENSLL SYDSSANSAT 360 LHSSQLKMEL * |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_85.120 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894046.1 | 0.0 | transcription factor bHLH48-like | ||||
| Swissprot | Q3EAI1 | 1e-118 | BH060_ARATH; Transcription factor bHLH60 | ||||
| TrEMBL | A0A061EXK6 | 1e-170 | A0A061EXK6_THECC; Basic helix-loop-helix DNA-binding superfamily protein, putative isoform 1 | ||||
| STRING | evm.model.supercontig_85.120 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM2576 | 27 | 71 | Representative plant | OGRP58 | 16 | 313 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G57800.2 | 1e-112 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_85.120 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




