![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_85.133 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 366aa MW: 40933.4 Da PI: 6.7822 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 14.5 | 0.00011 | 285 | 307 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
+ C +Cgk F + + ++H +++
evm.model.supercontig_85.133 285 FMCRKCGKAFAVRGDWRTHEKNC 307
89*****************9987 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM00355 | 0.58 | 201 | 223 | IPR015880 | Zinc finger, C2H2-like |
| Gene3D | G3DSA:3.30.160.60 | 7.5E-6 | 201 | 220 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| PROSITE profile | PS50157 | 9.64 | 201 | 228 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 203 | 223 | IPR007087 | Zinc finger, C2H2 |
| SuperFamily | SSF57667 | 1.74E-6 | 267 | 305 | No hit | No description |
| Gene3D | G3DSA:3.30.160.60 | 1.0E-5 | 281 | 305 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SMART | SM00355 | 49 | 285 | 305 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 8.808 | 285 | 305 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0009860 | Biological Process | pollen tube growth | ||||
| GO:0010500 | Biological Process | transmitting tissue development | ||||
| GO:1990058 | Biological Process | fruit replum development | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003676 | Molecular Function | nucleic acid binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 366 aa Download sequence Send to blast |
MADNSPYSNF LTGWFKFNPL HHYPSANPPP PPPPPPPSSS SSSSSSHPLY THFSYNFHQQ 60 QHQYPNPPTS PPLREALPLL SLTPTRKQNH EEEEEEEDQE VQEDGEDRLL SATTTTTTTT 120 LFSSASEDDD AAVTVALHIG LPSPSAAEMA SVLSSSSEIN TDKERDIHGG DESSGYPISR 180 LNKGQYWIPT PSQILIGPTQ FSCPVCCKTF NRYNNMQMHM WGHGSQYRKG PESLRGTQPT 240 GMLRLPCYCC APGCRNNIDH PRAKPLKDFR TLQTHYKRKH GIKPFMCRKC GKAFAVRGDW 300 RTHEKNCGKL WYCICGSDFK HKRSLKDHIR AFGNGHGAYG MDGFEEEDDP ASEVEQDNDS 360 SMQSK* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcriptional regulator required for normal differentiation of the ovary transmitting tract cells and pollen tube growth. In Arabidopsis, the transmitting tract facilitates the transport of pollen tubes to the ovules for fertilization (PubMed:17600712). May play a role in the regulation of AGL8/FUL, which is required for normal pattern of cell division, expansion and differentiation during morphogenesis of the silique (PubMed:23515580). Plays a role in replum development by the activation of the homeobox protein KNAT1 (PubMed:25039392). {ECO:0000269|PubMed:17600712, ECO:0000269|PubMed:23515580, ECO:0000269|PubMed:25039392}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_85.133 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893915.1 | 0.0 | zinc finger protein WIP2 | ||||
| Swissprot | Q9SVY1 | 1e-154 | ZWIP2_ARATH; Zinc finger protein WIP2 | ||||
| TrEMBL | A0A2C9V9J0 | 0.0 | A0A2C9V9J0_MANES; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_85.133 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM239 | 28 | 237 | Representative plant | OGRP410 | 15 | 97 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G57670.1 | 1e-152 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_85.133 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




