![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_85.56 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 326aa MW: 35940.3 Da PI: 8.4876 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 52.6 | 7.9e-17 | 177 | 231 | 2 | 56 |
T--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 2 rkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
rk+ +++k+q Lee F+++++++ +++ LA++l+L rqV vWFqNrRa+ k
evm.model.supercontig_85.56 177 RKKLRLSKQQSAFLEESFKEHNTLNPKQKLALARQLSLRPRQVEVWFQNRRARTK 231
778899***********************************************98 PP
| |||||||
| 2 | HD-ZIP_I/II | 125.9 | 1.8e-40 | 177 | 267 | 1 | 92 |
HD-ZIP_I/II 1 ekkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLek 82
+kk+rlsk+q+++LEesF+e+++L+p++K +lar+L l+prqv+vWFqnrRARtk+kq+E+d+e+Lkr++++l+een+rL+k
evm.model.supercontig_85.56 177 RKKLRLSKQQSAFLEESFKEHNTLNPKQKLALARQLSLRPRQVEVWFQNRRARTKLKQTEVDCEYLKRCCETLTEENRRLQK 258
69******************************************************************************** PP
HD-ZIP_I/II 83 eveeLreelk 92
e +eLr +lk
evm.model.supercontig_85.56 259 ELQELR-ALK 267
*****9.555 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF04618 | 6.3E-6 | 72 | 141 | IPR006712 | HD-ZIP protein, N-terminal |
| Gene3D | G3DSA:1.10.10.60 | 8.0E-17 | 161 | 227 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 8.13E-18 | 167 | 234 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 16.957 | 173 | 233 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 2.1E-14 | 175 | 237 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 5.37E-14 | 177 | 234 | No hit | No description |
| Pfam | PF00046 | 2.4E-14 | 177 | 231 | IPR001356 | Homeobox domain |
| PROSITE pattern | PS00027 | 0 | 208 | 231 | IPR017970 | Homeobox, conserved site |
| CDD | cd14686 | 0.00996 | 226 | 265 | No hit | No description |
| SMART | SM00340 | 4.5E-26 | 233 | 276 | IPR003106 | Leucine zipper, homeobox-associated |
| Pfam | PF02183 | 6.5E-11 | 233 | 267 | IPR003106 | Leucine zipper, homeobox-associated |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 326 aa Download sequence Send to blast |
MELALSLGDT SRPPFPFLDK TNKISAGGDL GFCMGLGTGF SPGRSQENGE AEKTGRNGDD 60 CRRSRFPADP PLQLDLLPFS PLPRSQQPPS QLRLPWLTHN LRSEPDGAGH GLDVNRVPAA 120 TEETEEGITL SSSPNSTVSS FQMEFGIGGR SKRETAEIEP ERASSRASDD DENGSTRKKL 180 RLSKQQSAFL EESFKEHNTL NPKQKLALAR QLSLRPRQVE VWFQNRRART KLKQTEVDCE 240 YLKRCCETLT EENRRLQKEL QELRALKTSQ PFYMQLPATT LTMCPSCERV SPTLPSSGAG 300 SGSSSANPQY PFPLKPHKGP QPAAS* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 175 | 181 | TRKKLRL |
| 2 | 225 | 233 | RRARTKLKQ |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor. {ECO:0000250}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_85.56 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021894059.1 | 0.0 | homeobox-leucine zipper protein HOX11 | ||||
| Swissprot | P46665 | 1e-97 | HAT14_ARATH; Homeobox-leucine zipper protein HAT14 | ||||
| TrEMBL | A0A2N9HGR9 | 1e-148 | A0A2N9HGR9_FAGSY; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_85.56 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4928 | 28 | 52 | Representative plant | OGRP196 | 16 | 156 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G06710.1 | 6e-83 | homeobox from Arabidopsis thaliana | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_85.56 |




