![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_89.73 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 238aa MW: 26368.4 Da PI: 6.9488 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 58.1 | 2.1e-18 | 71 | 121 | 2 | 56 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkrkrfslgkfgtaeeAakaaiaarkklege 56
y+GVr + +g+Wv+eIr+p++ + r++lg+f tae+Aa+a++ a+++++g+
evm.model.supercontig_89.73 71 AYRGVRMRQ-WGKWVSEIREPRK---KSRIWLGTFPTAEMAARAHDVAALAIKGH 121
69****998.**********843...6***********************99986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00018 | 9.76E-34 | 70 | 130 | No hit | No description |
| SuperFamily | SSF54171 | 4.58E-22 | 70 | 129 | IPR016177 | DNA-binding domain |
| PROSITE profile | PS51032 | 23.367 | 71 | 128 | IPR001471 | AP2/ERF domain |
| SMART | SM00380 | 2.0E-38 | 71 | 134 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 1.3E-12 | 71 | 121 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 1.0E-32 | 71 | 129 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 9.4E-11 | 72 | 83 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 9.4E-11 | 94 | 110 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 238 aa Download sequence Send to blast |
MEASFHQKCE ARSIGATSPS SSSSSTMLSS SSINKSCKKF GEEESEINVI NKSKKRVKIN 60 KNEEDGKNYS AYRGVRMRQW GKWVSEIREP RKKSRIWLGT FPTAEMAARA HDVAALAIKG 120 HSAHLNFPEL AHQLPRPSSA NPKDIQAAAA KAAALHCKKS GQDEKNRLVN APSSPASTVA 180 SDDDAFMDLP DLLMDVTRQI DEFWGPSSWQ VDTDDGPIDI GFNYHDDDEL FPWQYCH* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 4e-17 | 66 | 128 | 9 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00292 | DAP | Transfer from AT2G35700 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_89.73 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893663.1 | 1e-178 | ethylene-responsive transcription factor ERF039 | ||||
| Swissprot | Q9ZQP3 | 2e-52 | ERF38_ARATH; Ethylene-responsive transcription factor ERF038 | ||||
| TrEMBL | A0A061G3Z0 | 2e-69 | A0A061G3Z0_THECC; Integrase-type DNA-binding superfamily protein, putative | ||||
| STRING | evm.model.supercontig_89.73 | 1e-177 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM185 | 28 | 283 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G35700.1 | 6e-54 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_89.73 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




