![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_9.191 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 548aa MW: 59656.5 Da PI: 9.009 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 17.1 | 1.6e-05 | 6 | 28 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C++C+k F r nL+ H r H
evm.model.supercontig_9.191 6 FVCEICNKGFQRDQNLQLHRRGH 28
89*******************88 PP
| |||||||
| 2 | zf-C2H2 | 15.5 | 5e-05 | 82 | 104 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
+kC +C+k + +s+ k H++t+
evm.model.supercontig_9.191 82 WKCDKCSKKYAVQSDWKAHQKTC 104
58*******************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 5.94E-8 | 5 | 28 | No hit | No description |
| Gene3D | G3DSA:3.30.160.60 | 1.8E-5 | 5 | 28 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SMART | SM00355 | 0.017 | 6 | 28 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 10.949 | 6 | 28 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 8 | 28 | IPR007087 | Zinc finger, C2H2 |
| SMART | SM00355 | 98 | 47 | 77 | IPR015880 | Zinc finger, C2H2-like |
| Gene3D | G3DSA:3.30.160.60 | 6.4E-5 | 70 | 103 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SuperFamily | SSF57667 | 5.94E-8 | 77 | 103 | No hit | No description |
| SMART | SM00355 | 94 | 82 | 102 | IPR015880 | Zinc finger, C2H2-like |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003676 | Molecular Function | nucleic acid binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 548 aa Download sequence Send to blast |
MATNRFVCEI CNKGFQRDQN LQLHRRGHNL PWKLRQRTST EVKKRVYICP EPTCVHHNPA 60 RALGDLTGIK KHFSRKHGEK KWKCDKCSKK YAVQSDWKAH QKTCGTREYK CDCGTIFSRR 120 DSFITHRAFC DALAEENNKV NQGLMNQMGS NLQTQVPAEL MSSSMAGLNP NTINNPSIGS 180 DTFNTFDPKN PLKSLAQDLM PMPFKSMNMA GAGAGMFSSS SGTLFGGPRS NIASSSSSLQ 240 LSSNSTSSGF NYFHPDTKNG GSMSQLSAGS AHMSATALLQ KAAQMGATAS NSINSPMMQK 300 SFTGSMVGSD HNNHHHHHHQ IQGQLSSVRP SSSPAYSSAV QQHATNNSSS YDHIPPVMQN 360 HDDDRHHQSS HMVGINGGSS SSSTGLLPNQ LLRKNTQEIQ QIFDPSGNCS SAMNDIGILT 420 NMFMAGGEQN QGFPKNMEQE ESRSGSSLVQ GGRAALMADN RNNQIITGGS TRFGSGSSNG 480 GSSSDMMTLD FLGIGSVSRP VNLHEQQQKS LEMEAMSQQR LPLMNPYNQQ QLSHGDHSAI 540 EKPIWDV* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5b3h_C | 2e-33 | 78 | 141 | 3 | 66 | Zinc finger protein JACKDAW |
| 5b3h_F | 2e-33 | 78 | 141 | 3 | 66 | Zinc finger protein JACKDAW |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that acts as a positive regulator of gibberellin (GA) action, homeostasis and signaling. GA converts the GAF1 complex from transcriptional activator to repressor via the degradation of DELLA proteins. {ECO:0000269|PubMed:25035403}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_9.191 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021906681.1 | 0.0 | protein indeterminate-domain 9-like | ||||
| Swissprot | Q9SCQ6 | 3e-98 | IDD2_ARATH; Zinc finger protein GAI-ASSOCIATED FACTOR 1 | ||||
| TrEMBL | A0A3N7FC77 | 0.0 | A0A3N7FC77_POPTR; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_9.191 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM15443 | 8 | 18 | Representative plant | OGRP95 | 16 | 242 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G50700.1 | 3e-82 | indeterminate(ID)-domain 2 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_9.191 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




