![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_90.64 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | C3H | ||||||||
| Protein Properties | Length: 314aa MW: 32406.5 Da PI: 7.373 | ||||||||
| Description | C3H family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-CCCH | 31.7 | 2.7e-10 | 98 | 122 | 1 | 26 |
--S---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHg 26
+kt+lC+ f++ GtC+y +C+FaH+
evm.model.supercontig_90.64 98 FKTKLCCKFRA-GTCPYVTNCNFAHS 122
69*********.*************8 PP
| |||||||
| 2 | zf-CCCH | 18.8 | 2.9e-06 | 179 | 204 | 1 | 26 |
--S---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHg 26
yk + C+ f+ C+yGd+C+F H+
evm.model.supercontig_90.64 179 YKGRHCKKFYTEEGCPYGDNCTFLHD 204
78888********************7 PP
| |||||||
| 3 | zf-CCCH | 42.3 | 1.3e-13 | 280 | 305 | 1 | 26 |
--S---SGGGGTS--TTTTT-SS-SS CS
zf-CCCH 1 yktelCrffartGtCkyGdrCkFaHg 26
+kt++C+ + tG+C++G++C+FaHg
evm.model.supercontig_90.64 280 WKTRICNKWEITGYCPFGNKCHFAHG 305
8************************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:4.10.1000.10 | 2.8E-14 | 95 | 130 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 5.18E-8 | 95 | 128 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 12.868 | 97 | 124 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 0.0015 | 97 | 123 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 1.2E-7 | 98 | 122 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 14.23 | 178 | 206 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 2.9E-9 | 178 | 206 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 1.3E-7 | 178 | 206 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 0.058 | 178 | 205 | IPR000571 | Zinc finger, CCCH-type |
| Gene3D | G3DSA:4.10.1000.10 | 3.4E-16 | 273 | 308 | IPR000571 | Zinc finger, CCCH-type |
| SuperFamily | SSF90229 | 9.68E-10 | 276 | 306 | IPR000571 | Zinc finger, CCCH-type |
| SMART | SM00356 | 1.0E-8 | 279 | 306 | IPR000571 | Zinc finger, CCCH-type |
| PROSITE profile | PS50103 | 15.225 | 279 | 307 | IPR000571 | Zinc finger, CCCH-type |
| Pfam | PF00642 | 7.5E-11 | 280 | 305 | IPR000571 | Zinc finger, CCCH-type |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 314 aa Download sequence Send to blast |
MDCGRDSGGN VVHVITGNMP AENWIPNPND QVWATEEDYR VWTNPEASND NGSSSNYDQR 60 PSQTRSGSEQ PPSKKNRNSQ EANSSTSNRA KAIGKMFFKT KLCCKFRAGT CPYVTNCNFA 120 HSVEELRRPP ANWQEIVAAH EEEKAAAAAA GNPVAEPREE FQIPSLGSSA FGGEMGRSYK 180 GRHCKKFYTE EGCPYGDNCT FLHDEQSKNR ESVAISLGPG GYGGSAGSGS GAAVATAAAG 240 AGAGAGAGAG AGAGAGAGAG AGAGAGAGAG AAQNVKPSNW KTRICNKWEI TGYCPFGNKC 300 HFAHGAADSL AML* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_90.64 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893571.1 | 0.0 | zinc finger CCCH domain-containing protein 12-like isoform X2 | ||||
| Swissprot | Q9LQM3 | 1e-103 | C3H12_ARATH; Zinc finger CCCH domain-containing protein 12 | ||||
| TrEMBL | A0A1R3I420 | 1e-130 | A0A1R3I420_COCAP; Zinc finger, CCCH-type | ||||
| STRING | evm.model.supercontig_90.64 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM4003 | 27 | 58 | Representative plant | OGRP2045 | 17 | 37 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G32360.1 | 4e-76 | C3H family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_90.64 |




