![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_91.71 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 192aa MW: 20833.4 Da PI: 8.6721 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 55.5 | 1.4e-17 | 29 | 78 | 2 | 55 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
y+GVr + +g+Wv+eIr p+ + +r++lg+++ +e+Aa+a++aa +++g
evm.model.supercontig_91.71 29 PYRGVRMRA-WGKWVSEIRIPK----TgRRIWLGSYDAPEKAARAYDAAQYCIRG 78
69****998.**********95....35***********************9997 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF54171 | 4.97E-19 | 29 | 87 | IPR016177 | DNA-binding domain |
| SMART | SM00380 | 2.6E-29 | 29 | 92 | IPR001471 | AP2/ERF domain |
| PROSITE profile | PS51032 | 20.916 | 29 | 86 | IPR001471 | AP2/ERF domain |
| CDD | cd00018 | 4.13E-26 | 30 | 88 | No hit | No description |
| Gene3D | G3DSA:3.30.730.10 | 2.7E-26 | 30 | 87 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 3.1E-11 | 30 | 78 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 4.9E-9 | 30 | 41 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 4.9E-9 | 52 | 68 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 192 aa Download sequence Send to blast |
MDSRPSSPPK SPNSSLPQKR VRRDRKPKPY RGVRMRAWGK WVSEIRIPKT GRRIWLGSYD 60 APEKAARAYD AAQYCIRGDG GPFNFPANKK PQLPEGSLDS LSKEDIQTIA TNFAAGASAS 120 SPVAAPATTQ VSVNTPASFD FPVSGSCVTK SEVAGEPYFP STAIEEAANS VENLQLDDFL 180 MLDIEWISDL L* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5wx9_A | 7e-15 | 30 | 86 | 15 | 72 | Ethylene-responsive transcription factor ERF096 |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probably acts as a transcriptional activator. Binds to the GCC-box pathogenesis-related promoter element. May be involved in the regulation of gene expression by stress factors and by components of stress signal transduction pathways (By similarity). {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00463 | DAP | Transfer from AT4G31060 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_91.71 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Nucleotide ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | |||
| GenBank | KF678381 | 6e-31 | KF678381.1 Morus notabilis dehydration responsive element binding transcription factor (DREB5E) mRNA, complete cds. | |||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893531.1 | 1e-138 | ethylene-responsive transcription factor ERF015 | ||||
| Swissprot | Q6NLD5 | 9e-73 | ERF15_ARATH; Ethylene-responsive transcription factor ERF015 | ||||
| TrEMBL | A0A384LCY2 | 2e-70 | A0A384LCY2_ARATH; Uncharacterized protein | ||||
| TrEMBL | C0SVK9 | 2e-70 | C0SVK9_ARATH; Uncharacterized protein At4g31060 (Fragment) | ||||
| STRING | evm.model.supercontig_91.71 | 1e-137 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM14899 | 16 | 20 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G31060.1 | 7e-67 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_91.71 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




