![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_92.70 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | G2-like | ||||||||
| Protein Properties | Length: 318aa MW: 33849.7 Da PI: 6.9773 | ||||||||
| Description | G2-like family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | G2-like | 96.6 | 1.8e-30 | 103 | 156 | 1 | 55 |
G2-like 1 kprlrWtpeLHerFveaveqLGGsekAtPktilelmkvkgLtlehvkSHLQkYRl 55
+prl+Wtp+LH+rFv+av++L G+++A+Pkti++lm+v+gLt+e+v+SHLQkYRl
evm.model.supercontig_92.70 103 RPRLVWTPQLHKRFVDAVAHL-GIKNAVPKTIMQLMSVDGLTRENVASHLQKYRL 156
59*******************.********************************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 3.14E-20 | 100 | 160 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS51294 | 11.059 | 100 | 159 | IPR017930 | Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 1.3E-30 | 102 | 161 | IPR009057 | Homeodomain-like |
| TIGRFAMs | TIGR01557 | 3.5E-24 | 104 | 156 | IPR006447 | Myb domain, plants |
| Pfam | PF00249 | 1.2E-7 | 106 | 155 | IPR001005 | SANT/Myb domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 318 aa Download sequence Send to blast |
MREEDSNWFS RWEEELPSPE ELMPLSQTLI TPDLAIAFDI RNHNSSSGQQ QQPNPPPPPP 60 PSATPPPSNP LAASQPNSAE FGADSAELGS GAAGDEPART LKRPRLVWTP QLHKRFVDAV 120 AHLGIKNAVP KTIMQLMSVD GLTRENVASH LQKYRLYLKR MQGLSGGGGG AGGNGGGGGG 180 AGLAASSDPA TDHLFASSPV PPHFLHPGRP NSDHFLPSFV PVAALQHHHH HQQMAAAAAA 240 AVAHPHLQPQ YHRQMGHFGS PPNGQFEHSF LARQTQQPIH RMGAPVHNPV PGYVEDLESA 300 NANGGRKVLT LFPTGDD* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5lxu_A | 3e-32 | 103 | 159 | 1 | 57 | Transcription factor LUX |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor that acts as a negative regulator of freezing tolerance via a CBF-independent pathway. {ECO:0000269|PubMed:20331973}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_92.70 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by drought, salt and abscisic acid (ABA). Down-regulated by cold. {ECO:0000269|PubMed:20331973}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893418.1 | 0.0 | transcription factor MYBC1-like | ||||
| Swissprot | O22210 | 3e-64 | MYBC1_ARATH; Transcription factor MYBC1 | ||||
| TrEMBL | A0A2P2JJL7 | 1e-144 | A0A2P2JJL7_RHIMU; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_92.70 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM1549 | 27 | 91 | Representative plant | OGRP1157 | 17 | 53 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G10760.1 | 1e-100 | G2-like family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_92.70 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




