![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_92.83 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 238aa MW: 26424.9 Da PI: 8.1398 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 40.3 | 5.9e-13 | 66 | 112 | 3 | 54 |
HHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHH CS
HLH 3 rahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksL 54
++h+e+E+rRR+riNs +++Lr+llP + K +Ka+ L k+v+ +k+L
evm.model.supercontig_92.83 66 KNHKEAEKRRRERINSHLNKLRTLLPCN-----SKTDKASLLAKVVQRVKEL 112
58*************************8.....7************999988 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 15.548 | 63 | 112 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 1.7E-10 | 66 | 112 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 5.84E-12 | 66 | 115 | No hit | No description |
| SuperFamily | SSF47459 | 3.93E-14 | 67 | 125 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 4.5E-14 | 67 | 120 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 1.4E-11 | 69 | 118 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:3.30.70.260 | 1.4E-4 | 150 | 214 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0042538 | Biological Process | hyperosmotic salinity response | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0009941 | Cellular Component | chloroplast envelope | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 238 aa Download sequence Send to blast |
MQPAENSELY QFLTENGVGS YGFLQNCGEY SAAMSSFCGS TSSFYPLDLS GISDTTPQDR 60 ALAALKNHKE AEKRRRERIN SHLNKLRTLL PCNSKTDKAS LLAKVVQRVK ELKQQTNEIS 120 GLESFPSETD EISVLSGECS SDGRLIFKAS LCCEDRSDLL PELIEILKSL HLKTLRAEIA 180 TLGGRIRNVL VVAADKDHSS VESVHFLQNA LKSLLERSTS NDRSKRRRAL DHHKIFV* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_92.83 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893378.1 | 1e-174 | transcription factor bHLH106-like | ||||
| Swissprot | O80674 | 6e-92 | BH106_ARATH; Transcription factor bHLH106 | ||||
| TrEMBL | A0A061F2R4 | 1e-126 | A0A061F2R4_THECC; Basic helix-loop-helix DNA-binding superfamily protein | ||||
| STRING | evm.model.supercontig_92.83 | 1e-173 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM3642 | 27 | 62 | Representative plant | OGRP377 | 15 | 106 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G41130.1 | 3e-94 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_92.83 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




