![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_95.69 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | MYB | ||||||||
| Protein Properties | Length: 375aa MW: 42089.7 Da PI: 5.4324 | ||||||||
| Description | MYB family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Myb_DNA-binding | 52.1 | 1.5e-16 | 14 | 62 | 1 | 48 |
TSSS-HHHHHHHHHHHHHTTTT.-HHHHHHHHTTTS-HHHHHHHHHHHT CS
Myb_DNA-binding 1 rgrWTteEdellvdavkqlGgg.tWktIartmgkgRtlkqcksrwqkyl 48
+g+W++eEd +l+ +++++G+g +W + ++++g++R++k+c++rw++yl
evm.model.supercontig_95.69 14 KGPWSPEEDAKLKAYIEKYGTGgNWIALPQKIGLKRCGKSCRLRWLNYL 62
79*********************************************97 PP
| |||||||
| 2 | Myb_DNA-binding | 37.4 | 5.9e-12 | 69 | 111 | 2 | 46 |
SSS-HHHHHHHHHHHHHTTTT-HHHHHHHHTTTS-HHHHHHHHHH CS
Myb_DNA-binding 2 grWTteEdellvdavkqlGggtWktIartmgkgRtlkqcksrwqk 46
g +++eEd ++ + G++ W+ Ia+ ++ gRt++++k++w++
evm.model.supercontig_95.69 69 GGFSEEEDNIICSLYISIGSR-WSIIAAQLP-GRTDNDIKNYWNT 111
569******************.*********.***********97 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS51294 | 15.076 | 9 | 62 | IPR017930 | Myb domain |
| SuperFamily | SSF46689 | 4.0E-27 | 11 | 109 | IPR009057 | Homeodomain-like |
| SMART | SM00717 | 2.1E-13 | 13 | 64 | IPR001005 | SANT/Myb domain |
| Pfam | PF00249 | 1.6E-15 | 14 | 62 | IPR001005 | SANT/Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 8.4E-25 | 15 | 69 | IPR009057 | Homeodomain-like |
| CDD | cd00167 | 6.81E-10 | 16 | 62 | No hit | No description |
| PROSITE profile | PS51294 | 21.666 | 63 | 117 | IPR017930 | Myb domain |
| SMART | SM00717 | 4.8E-11 | 67 | 115 | IPR001005 | SANT/Myb domain |
| Pfam | PF00249 | 1.4E-10 | 69 | 111 | IPR001005 | SANT/Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 3.2E-23 | 70 | 117 | IPR009057 | Homeodomain-like |
| CDD | cd00167 | 9.42E-8 | 71 | 113 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0008285 | Biological Process | negative regulation of cell proliferation | ||||
| GO:0035987 | Biological Process | endodermal cell differentiation | ||||
| GO:0045597 | Biological Process | positive regulation of cell differentiation | ||||
| GO:0045892 | Biological Process | negative regulation of transcription, DNA-templated | ||||
| GO:0045893 | Biological Process | positive regulation of transcription, DNA-templated | ||||
| GO:2000021 | Biological Process | regulation of ion homeostasis | ||||
| GO:2000067 | Biological Process | regulation of root morphogenesis | ||||
| GO:0048226 | Cellular Component | Casparian strip | ||||
| GO:0000975 | Molecular Function | regulatory region DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 375 aa Download sequence Send to blast |
MGRAPCCDKA NVKKGPWSPE EDAKLKAYIE KYGTGGNWIA LPQKIGLKRC GKSCRLRWLN 60 YLRPNIKHGG FSEEEDNIIC SLYISIGSRW SIIAAQLPGR TDNDIKNYWN TRLKKKLLGR 120 RKNSNRNDPN ETANGTANES NQFQQTLSNS ALERLQLHMQ LQSLQNPISF YNNPALWPKL 180 HPLQEKINQS LQSLNLQNPN QNNNSNSNPL VQSASLAGSE MEQPGHDQKV DQFYEPVSLH 240 LKVEDQLGSS LNITDSSTDF ATGNINSISL DPTMGNMQQS ELLHQVPNFQ AEMLLDDFLN 300 NKNLCSGFAS QVDQDQIGDE FDCFKEINGS SKDSLVWWSN EFDTKSASSN SWDSTSVLGS 360 DHGMFQDYEL GYNM* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1a5j_A | 8e-25 | 14 | 117 | 7 | 108 | B-MYB |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factors that activates genes required for endodermal differentiation but represses genes involved in proliferative divisions, thus regulating the transition from proliferation to differentiation in root endodermis (PubMed:26371322). Required for Casparian strip formation by positively regulating the expression of the Casparian strip genes CASP1, PER64 and ESB1 and other endodermis-specific genes, thus triggering correct localized lignin biosynthesis in root endodermis and subsequently regulating global ion homeostasis (PubMed:26124109, PubMed:26371322). {ECO:0000269|PubMed:26124109, ECO:0000269|PubMed:26371322}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_95.69 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Directly up-regulated by SCARECROW (SCR), as part of the differentiation program controlled by SHORT-ROOT (SHR). {ECO:0000269|PubMed:24517883, ECO:0000269|PubMed:26371322}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021893135.1 | 0.0 | transcription factor MYB36 | ||||
| Swissprot | Q9FKL2 | 1e-105 | MYB36_ARATH; Transcription factor MYB36 | ||||
| TrEMBL | A0A061GXE3 | 1e-159 | A0A061GXE3_THECC; Myb domain protein 36 | ||||
| STRING | evm.model.supercontig_95.69 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM7898 | 26 | 39 | Representative plant | OGRP5 | 17 | 1784 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G57620.1 | 3e-95 | myb domain protein 36 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_95.69 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




