![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_98.6 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 761aa MW: 84323.3 Da PI: 6.2865 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 67.2 | 2.2e-21 | 106 | 161 | 1 | 56 |
TT--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHH CS
Homeobox 1 rrkRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakek 56
r+k +++t+eq++e+e+lF+++++p++++r++L+k+lgL rqVk+WFqNrR++ k
evm.model.supercontig_98.6 106 RKKYHRHTAEQIREMEALFKESPHPDEKQRQQLSKQLGLAPRQVKFWFQNRRTQIK 161
7999************************************************9877 PP
| |||||||
| 2 | START | 214.8 | 3e-67 | 274 | 500 | 2 | 206 |
HHHHHHHHHHHHHHHC-TT-EEEE....EXCCTTEEEEEEESSS..........SCEEEEEEEECCSCHHHHHHHHHCCCGGC CS
START 2 laeeaaqelvkkalaeepgWvkss....esengdevlqkfeeskv.........dsgealrasgvvdmvlallveellddkeq 71
+ +ea++el k+a+a++p+Wv+s e++n+d+++++f+ +++ s+ea+r++g+v+ +l +l + +ld + q
evm.model.supercontig_98.6 274 IVNEAMEELKKMASAGHPLWVRSLetgrEILNYDVYMKEFSVENSpvnikrpvmTSIEASRDTGLVFVDLSKLIQCFLDGN-Q 355
6689************************************988889***********************************.* PP
T-TT-S....EEEEEEEECTT......EEEEEEEEXXTTXX-SSX.EEEEEEEEEEE.TTS-EEEEEEEEE-TTS--.-TTSE CS
START 72 Wdetla....kaetlevissg......galqlmvaelqalsplvp.RdfvfvRyirqlgagdwvivdvSvdseqkppesssvv 143
W+e+++ ka+++++i+ g ga+qlm+aelq+l+p+vp R+++fvRy+++l+ ++w+ivdvS+d +++ ++s+v
evm.model.supercontig_98.6 356 WKEMFPclvsKAAIVDTICHGegpnrnGAVQLMFAELQMLTPMVPtREVYFVRYCKELSSEQWAIVDVSIDKVEENI-DASLV 437
***************************************************************************98.9**** PP
E-EESSEEEEEEEECTCEEEEEEEE-EE--SSXXHHHHHHHHHHHHHHHHHHHHHHTXXXXXX CS
START 144 RaellpSgiliepksnghskvtwvehvdlkgrlphwllrslvksglaegaktwvatlqrqcek 206
+++++pSg++ie+ksngh+kvtwveh +++++ +h ++r +v++gla+ga++w+atlq ce+
evm.model.supercontig_98.6 438 KCRKRPSGCIIEDKSNGHCKVTWVEHLECQKSNVHTMYRTIVNNGLAFGARHWLATLQLECER 500
*************************************************************96 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Gene3D | G3DSA:1.10.10.60 | 5.2E-23 | 91 | 157 | IPR009057 | Homeodomain-like |
| SuperFamily | SSF46689 | 1.13E-20 | 94 | 164 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS50071 | 18.22 | 103 | 163 | IPR001356 | Homeobox domain |
| SMART | SM00389 | 8.3E-19 | 105 | 167 | IPR001356 | Homeobox domain |
| Pfam | PF00046 | 1.0E-18 | 106 | 161 | IPR001356 | Homeobox domain |
| CDD | cd00086 | 4.12E-17 | 110 | 161 | No hit | No description |
| PROSITE pattern | PS00027 | 0 | 138 | 161 | IPR017970 | Homeobox, conserved site |
| PROSITE profile | PS50848 | 38.399 | 264 | 503 | IPR002913 | START domain |
| SuperFamily | SSF55961 | 3.3E-33 | 267 | 500 | No hit | No description |
| CDD | cd08875 | 2.45E-107 | 268 | 499 | No hit | No description |
| SMART | SM00234 | 2.3E-67 | 273 | 500 | IPR002913 | START domain |
| Pfam | PF01852 | 2.1E-53 | 274 | 500 | IPR002913 | START domain |
| Gene3D | G3DSA:3.30.530.20 | 1.5E-6 | 330 | 487 | IPR023393 | START-like domain |
| SuperFamily | SSF55961 | 1.51E-10 | 530 | 743 | No hit | No description |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0009957 | Biological Process | epidermal cell fate specification | ||||
| GO:0010062 | Biological Process | negative regulation of trichoblast fate specification | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0008289 | Molecular Function | lipid binding | ||||
| GO:0043565 | Molecular Function | sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 761 aa Download sequence Send to blast |
MGVDMSNPPN SHTKDFFASP ALSLSLAGIF RDGGAGAAAA AAGSMEVEEG DEGSGGGGRR 60 DEYQRAEISS ENSGPTRSRS EDDFDREDHN EGDEDHGDDK NKKKKRKKYH RHTAEQIREM 120 EALFKESPHP DEKQRQQLSK QLGLAPRQVK FWFQNRRTQI KAIQERHENS VLKSELDKLR 180 EENKIMRETI NKACCPNCGS GTTTRDACIT PEEQELRIEN AKLKAEVERL RAGIGKQQAA 240 GAASCSAGNE QENRSSLDFY TGIFGVDKSR ITEIVNEAME ELKKMASAGH PLWVRSLETG 300 REILNYDVYM KEFSVENSPV NIKRPVMTSI EASRDTGLVF VDLSKLIQCF LDGNQWKEMF 360 PCLVSKAAIV DTICHGEGPN RNGAVQLMFA ELQMLTPMVP TREVYFVRYC KELSSEQWAI 420 VDVSIDKVEE NIDASLVKCR KRPSGCIIED KSNGHCKVTW VEHLECQKSN VHTMYRTIVN 480 NGLAFGARHW LATLQLECER LVFFMATNVP TKDSIGVATL AGRKSILKLA QRMTWSFCHA 540 LGASSYHTWN KVSSKTGEDV RVSSRKNLND PGEPVGVIVC AVSSVWLPVC PHLLFDFLRD 600 EARHSEWDMM SNGGPVQSIA NLAKGQDRGN AVTIQNIKSK ENSLWVLQDS SINAYESMVV 660 YAPVDITGMQ SVITGCDSSS IAILPSGFSI LPDGLESRPL VITSRPEKSN EGGSLLTIAF 720 QILTNTSPNA KLTMESVESV NTLISCTLRN IRTSLQIEDG * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 101 | 106 | KKKKRK |
| 2 | 101 | 107 | KKKKRKK |
| 3 | 103 | 107 | KKRKK |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor required for correct morphological development and maturation of trichomes as well as for normal development of seed coat mucilage. Regulates the frequency of trichome initiation and determines trichome spacing. {ECO:0000269|PubMed:11844112}. | |||||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_98.6 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Down-regulated by GEM. {ECO:0000269|PubMed:17450124}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892835.1 | 0.0 | homeobox-leucine zipper protein GLABRA 2 | ||||
| Swissprot | P46607 | 0.0 | HGL2_ARATH; Homeobox-leucine zipper protein GLABRA 2 | ||||
| TrEMBL | A0A1R3G7N4 | 0.0 | A0A1R3G7N4_COCAP; Uncharacterized protein | ||||
| STRING | evm.model.supercontig_98.6 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM12370 | 27 | 31 | Representative plant | OGRP9080 | 9 | 13 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G79840.1 | 0.0 | HD-ZIP family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_98.6 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




