![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_99.20 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 260aa MW: 28905.7 Da PI: 8.152 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 60.7 | 3.5e-19 | 79 | 128 | 2 | 55 |
AP2 2 gykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
ykGVr++ +g+WvAeIr+p + r +r +lg+f+t eAa a++aa++kl+g
evm.model.supercontig_99.20 79 TYKGVRQRT-WGKWVAEIREP---N-RgARLWLGTFDTSHEAALAYDAAARKLYG 128
69****999.**********8...3.35*************************98 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00018 | 5.99E-22 | 78 | 138 | No hit | No description |
| PROSITE profile | PS51032 | 22.366 | 79 | 136 | IPR001471 | AP2/ERF domain |
| Pfam | PF00847 | 3.3E-14 | 79 | 128 | IPR001471 | AP2/ERF domain |
| Gene3D | G3DSA:3.30.730.10 | 1.6E-30 | 79 | 137 | IPR001471 | AP2/ERF domain |
| SuperFamily | SSF54171 | 1.9E-21 | 79 | 137 | IPR016177 | DNA-binding domain |
| SMART | SM00380 | 2.4E-37 | 79 | 142 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 9.3E-10 | 80 | 91 | IPR001471 | AP2/ERF domain |
| PRINTS | PR00367 | 9.3E-10 | 102 | 118 | IPR001471 | AP2/ERF domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0010200 | Biological Process | response to chitin | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| GO:0003700 | Molecular Function | transcription factor activity, sequence-specific DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 260 aa Download sequence Send to blast |
MCLPIFSNNT PKKKKKKRTR NNHSFPAAAD RVLCLCWHLY TCIYIFIYVH INMSKSVMES 60 SSRKGCMRGK GGPENALCTY KGVRQRTWGK WVAEIREPNR GARLWLGTFD TSHEAALAYD 120 AAARKLYGPE AKLNLPQQPS NSSNNTHLII PQMGNQFPNH RTSAPSCSSN NDSTVPCPDS 180 KVESRGNLVD SNVKFGKDED GMEEIWENMS LNLPVFDDSI WAEAAMSLGF PTMEDPGILG 240 GNFVDTTGWD SLHSPPWCS* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 1gcc_A | 3e-18 | 80 | 136 | 3 | 60 | ETHYLENE RESPONSIVE ELEMENT BINDING FACTOR 1 |
| Search in ModeBase | ||||||
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 11 | 17 | KKKKKKR |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Putative transcriptional activator that binds specifically to the DNA sequence 5'-[AG]CCGAC-3'. Binding to the C-repeat/DRE element mediates high salinity-inducible transcription. {ECO:0000269|PubMed:11798174}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00240 | DAP | Transfer from AT1G75490 | Download |
| |||
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_99.20 |
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: By high-salt stress. {ECO:0000269|PubMed:11798174}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892801.1 | 0.0 | dehydration-responsive element-binding protein 2D-like | ||||
| Swissprot | Q9LQZ2 | 1e-56 | DRE2D_ARATH; Dehydration-responsive element-binding protein 2D | ||||
| TrEMBL | A0A1U8JFD6 | 3e-81 | A0A1U8JFD6_GOSHI; dehydration-responsive element-binding protein 2D-like | ||||
| STRING | evm.model.supercontig_99.20 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM5399 | 26 | 48 | Representative plant | OGRP6 | 16 | 1718 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G75490.1 | 7e-51 | ERF family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_99.20 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




