![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.supercontig_99.32 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; eudicotyledons; Gunneridae; Pentapetalae; rosids; malvids; Brassicales; Caricaceae; Carica
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 310aa MW: 33948.1 Da PI: 7.1781 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 15.4 | 3.5e-05 | 201 | 240 | 11 | 55 |
HHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 11 rRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
R +++ ++++ L++l+ + +K + a++L +A+ YIk Lq
evm.model.supercontig_99.32 201 ARKEKLGDRIAALQQLVAPF-----GKTDTASVLMEAIGYIKFLQ 240
57788999*********998.....8******************9 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50888 | 11.261 | 190 | 239 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 1.3E-10 | 200 | 251 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| CDD | cd00083 | 4.51E-5 | 202 | 244 | No hit | No description |
| Gene3D | G3DSA:4.10.280.10 | 5.4E-9 | 204 | 247 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 310 aa Download sequence Send to blast |
MESANLHHQH DQVEHNLAGT NSSCYGVTTS QAWTPNISLI NGASTSGNIV SINSTDQSAH 60 EYFPNFTEML NSSHSTTAMK MINKDHNTMS SSDLIPINAH NLHQFYSHNS SIFGNFTQIH 120 PTIDVSNFNI HMNLKAMDAG FNATCIQFSS TDLGKLSPSF PNQITSEEKR SSILVEKPNA 180 TEAPTKKSRL DSRASCPPFK ARKEKLGDRI AALQQLVAPF GKTDTASVLM EAIGYIKFLQ 240 NQIETLSVAY MKSSSGKKMV RRAQKGLTAE EVESDEDRQD LRSRGLCLVP LSCMAYVTSS 300 VGGEMLLHN* |
| Cis-element ? help Back to Top | |
|---|---|
| Source | Link |
| PlantRegMap | evm.model.supercontig_99.32 |
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_021892811.1 | 0.0 | transcription factor bHLH110 isoform X1 | ||||
| TrEMBL | A0A2I4ENQ5 | 2e-76 | A0A2I4ENQ5_JUGRE; transcription factor bHLH110 | ||||
| STRING | evm.model.supercontig_99.32 | 0.0 | (Carica papaya) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Malvids | OGEM9351 | 25 | 33 | Representative plant | OGRP1342 | 13 | 37 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G27660.1 | 3e-51 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm.model.supercontig_99.32 |




