![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00001.504 | ||||||||
| Common Name | AMTR_s00001p00272070, LOC18424562 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 390aa MW: 43205.8 Da PI: 7.08 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 39.6 | 9.6e-13 | 187 | 238 | 1 | 55 |
CHHHHHHHHHHHHHHHHHHHHHHHCTSCCC...TTS-STCHHHHHHHHHHHHHHH CS
HLH 1 rrrahnerErrRRdriNsafeeLrellPkaskapskKlsKaeiLekAveYIksLq 55
+r++h ++Er+RR+++N+ ++ Lr+l+P + ++ + a+i A++++k+L+
evm_27.model.AmTr_v1.0_scaffold00001.504 187 QRMTHIAVERNRRKQMNEHLNALRSLMPAS---FIQRGDQASIIGGAIDFVKELE 238
79***************************9...9******************995 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| CDD | cd00083 | 1.58E-13 | 185 | 242 | No hit | No description |
| PROSITE profile | PS50888 | 15.491 | 186 | 237 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SuperFamily | SSF47459 | 2.36E-16 | 186 | 255 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Pfam | PF00010 | 3.9E-10 | 187 | 238 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene3D | G3DSA:4.10.280.10 | 2.0E-14 | 187 | 251 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| SMART | SM00353 | 5.3E-11 | 192 | 243 | IPR011598 | Myc-type, basic helix-loop-helix (bHLH) domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0046983 | Molecular Function | protein dimerization activity | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 390 aa Download sequence Send to blast |
MQGPIDPCCL QAFVEHQTLE CLDQGNGVDL GAPAWAPTLG AEGLRLGDNW FTSFCSLSPQ 60 KSAMPNLSFL NILEPARASG LCPYFMDSSH IQALELESCI THVSETYSPE KPGAKDIRKL 120 EEAASSVNRE PNSPENGRDH NSGSSSGWVR ELRAQPEAKH LSTGAVRERK KRKRSKACKN 180 SREVESQRMT HIAVERNRRK QMNEHLNALR SLMPASFIQR GDQASIIGGA IDFVKELEQL 240 LQSLQAKKQT RQSEEGYSPT SSTVPFNGFF SSPQYTTYSN FKYMVDGLMD QRGNEFKAEN 300 KSAVADIEVT LIQTHANLKI LSPRRPGQLL KTIAALENLE LTILHLNITT IQHSVLYSFN 360 LKIEEGCKLG SADEIAAAVH QIFSFINEN* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 168 | 173 | RKKRKR |
| 2 | 169 | 174 | KKRKRS |
| 3 | 187 | 198 | RMTHIAVERNRR |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription activator (PubMed:17088607, PubMed:17183265, PubMed:17183267). Together with MYB88 and MYB124, ensures that stomata contain just two guard cells (GCs) by enforcing a single symmetric precursor cell division before stomatal maturity (PubMed:24571519). Together with SPCH and MUTE, regulates the stomata formation. Required to promote differentiation and morphogenesis of stomatal guard cells and to halt proliferative divisions in their immediate precursors. Mediates the formation of stomata (PubMed:17088607, PubMed:17183265, PubMed:17183267). Prevents histone H3K27me3 marks and derepresses stem cell gene expression (PubMed:24654956). {ECO:0000269|PubMed:17088607, ECO:0000269|PubMed:17183265, ECO:0000269|PubMed:17183267, ECO:0000269|PubMed:24571519, ECO:0000269|PubMed:24654956}. | |||||
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Inhibited by low relative humidity (LRH) via epigenetic CG methylation, thus leading to a reduced stomatal index. {ECO:0000269|PubMed:22442411}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_006829211.1 | 0.0 | transcription factor bHLH94 isoform X1 | ||||
| Swissprot | Q56YJ8 | 2e-66 | FAMA_ARATH; Transcription factor FAMA | ||||
| TrEMBL | W1NLC0 | 0.0 | W1NLC0_AMBTC; Uncharacterized protein | ||||
| STRING | ERM96627 | 0.0 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP253 | 15 | 131 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G24140.1 | 9e-69 | bHLH family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00001.504 |
| Entrez Gene | 18424562 |




