![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00012.254 | ||||||||
| Common Name | AMTR_s00012p00251530, LOC18436206 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | G2-like | ||||||||
| Protein Properties | Length: 288aa MW: 32056.2 Da PI: 6.6162 | ||||||||
| Description | G2-like family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | G2-like | 95.4 | 4.2e-30 | 135 | 188 | 1 | 55 |
G2-like 1 kprlrWtpeLHerFveaveqLGGsekAtPktilelmkvkgLtlehvkSHLQkYRl 55
+prl+Wtp+LH+rFv++v++L G+++A+Pkti++lm+v+gLt+e+v+SHLQkYRl
evm_27.model.AmTr_v1.0_scaffold00012.254 135 RPRLVWTPQLHKRFVDVVAHL-GIKNAVPKTIMQLMNVEGLTRENVASHLQKYRL 188
59*******************.********************************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF46689 | 1.27E-19 | 132 | 192 | IPR009057 | Homeodomain-like |
| PROSITE profile | PS51294 | 10.061 | 132 | 191 | IPR017930 | Myb domain |
| Gene3D | G3DSA:1.10.10.60 | 2.8E-30 | 134 | 193 | IPR009057 | Homeodomain-like |
| TIGRFAMs | TIGR01557 | 1.3E-23 | 136 | 188 | IPR006447 | Myb domain, plants |
| Pfam | PF00249 | 4.7E-8 | 138 | 187 | IPR001005 | SANT/Myb domain |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| GO:0042753 | Biological Process | positive regulation of circadian rhythm | ||||
| GO:0005634 | Cellular Component | nucleus | ||||
| GO:0003677 | Molecular Function | DNA binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 288 aa Download sequence Send to blast |
MGEEEQSIDY QPSSEEDHVM EWELGLPRAE DLTPLSQVLI PPELASAFSI SPEACRSMLD 60 VNRASQNTVS TLRRQALPTN LKSLPSFSLQ QEHEPTEPAT ESRARKFSDR EATDEIMDSS 120 RPDPVDEQSA RTLKRPRLVW TPQLHKRFVD VVAHLGIKNA VPKTIMQLMN VEGLTRENVA 180 SHLQKYRLYL KRMQGLSSEG PSSSDHLFAS TPVPHSLARE EPQGLMPIPM PYMIPMPMAG 240 HHAHGHMGHG HGHMAMTNGN MGYHGYGAFG PQNKFDSIVG YPHVSKQ* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5lxu_A | 3e-33 | 135 | 191 | 1 | 57 | Transcription factor LUX |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Transcription factor that is essential for the generation of the circadian clock oscillation. Is necessary for activation of CCA1 and LHY expression. Is coregulated with TOC1 and seems to be repressed by CCA1 and LHY by direct binding of these proteins to the evening element in the LUX promoter. Directly regulates the expression of PRR9, a major component of the morning transcriptional feedback circuit, by binding specific sites on PRR9 promoter. Binds to its own promoter, inducing a negative auto-regulatory feedback loop within the core clock. Binds to ELF3 and associates with ELF4 in a diurnal complex which is required for the expression of the growth-promoting transcription factors PIF4 and PIF5 and subsequent hypocotyl growth in the early evening. {ECO:0000269|PubMed:16006522, ECO:0000269|PubMed:16164597, ECO:0000269|PubMed:21236673, ECO:0000269|PubMed:21753751, ECO:0000269|PubMed:22311777}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00014 | PBM | Transfer from AT3G46640 | Download |
| |||
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Circadian oscillation with peaks at subjective dusk. {ECO:0000269|PubMed:16006522, ECO:0000269|PubMed:16164597, ECO:0000269|PubMed:17132630, ECO:0000269|PubMed:21753751}. | |||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_006846291.1 | 0.0 | transcription factor PCL1 | ||||
| Refseq | XP_020524037.1 | 0.0 | transcription factor PCL1 | ||||
| Refseq | XP_020524038.1 | 0.0 | transcription factor PCL1 | ||||
| Refseq | XP_020524039.1 | 0.0 | transcription factor PCL1 | ||||
| Swissprot | Q9SNB4 | 9e-85 | PCL1_ARATH; Transcription factor LUX | ||||
| TrEMBL | W1PJX6 | 0.0 | W1PJX6_AMBTC; Uncharacterized protein | ||||
| STRING | ERN07966 | 0.0 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP1157 | 17 | 53 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G46640.2 | 6e-82 | G2-like family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00012.254 |
| Entrez Gene | 18436206 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




