| Signature Domain? help Back to Top |
 |
| No. |
Domain |
Score |
E-value |
Start |
End |
HMM Start |
HMM End |
| 1 | WRKY | 96.5 | 1.9e-30 | 266 | 323 | 3 | 59 |
-SS-EEEEEEE--TT-SS-EEEEEE-ST.T---EEEEEE-SSSTTEEEEEEES--SS- CS
WRKY 3 DgynWrKYGqKevkgsefprsYYrCtsa.gCpvkkkversaedpkvveitYegeHnhe 59
Dg++WrKYGqK kg+++pr+YYrCt+a gCpv+k+v+r+aed +++++tYeg+Hnh+
evm_27.model.AmTr_v1.0_scaffold00015.38 266 DGCQWRKYGQKLAKGNPCPRAYYRCTMAaGCPVRKQVQRCAEDRSILITTYEGNHNHP 323
9**************************99****************************7 PP
|
| Publications
? help Back to Top |
- Zhou F, et al.
High humidity suppresses ssi4-mediated cell death and disease resistance upstream of MAP kinase activation, H2O2 production and defense gene expression. Plant J., 2004. 39(6): p. 920-32 [PMID:15341634] - Ramírez V,López A,Mauch-Mani B,Gil MJ,Vera P
An extracellular subtilase switch for immune priming in Arabidopsis. PLoS Pathog., 2013. 9(6): p. e1003445 [PMID:23818851] - Amborella Genome Project
The Amborella genome and the evolution of flowering plants. Science, 2013. 342(6165): p. 1241089 [PMID:24357323] - Ding Y, et al.
Four distinct types of dehydration stress memory genes in Arabidopsis thaliana. BMC Plant Biol., 2013. 13: p. 229 [PMID:24377444] - Singh V,Roy S,Singh D,Nandi AK
Arabidopsis flowering locus D influences systemic-acquired-resistance- induced expression and histone modifications of WRKY genes. J. Biosci., 2014. 39(1): p. 119-26 [PMID:24499796] - Ali MA,Wieczorek K,Kreil DP,Bohlmann H
The beet cyst nematode Heterodera schachtii modulates the expression of WRKY transcription factors in syncytia to favour its development in Arabidopsis roots. PLoS ONE, 2014. 9(7): p. e102360 [PMID:25033038] - Chai J,Liu J,Zhou J,Xing D
Mitogen-activated protein kinase 6 regulates NPR1 gene expression and activation during leaf senescence induced by salicylic acid. J. Exp. Bot., 2014. 65(22): p. 6513-28 [PMID:25210078] - Vermeirssen V,De Clercq I,Van Parys T,Van Breusegem F,Van de Peer Y
Arabidopsis ensemble reverse-engineered gene regulatory network discloses interconnected transcription factors in oxidative stress. Plant Cell, 2014. 26(12): p. 4656-79 [PMID:25549671] - Xiao D, et al.
SENESCENCE-SUPPRESSED PROTEIN PHOSPHATASE Directly Interacts with the Cytoplasmic Domain of SENESCENCE-ASSOCIATED RECEPTOR-LIKE KINASE and Negatively Regulates Leaf Senescence in Arabidopsis. Plant Physiol., 2015. 169(2): p. 1275-91 [PMID:26304848] - Bakshi M, et al.
WRKY6 restricts Piriformospora indica-stimulated and phosphate-induced root development in Arabidopsis. BMC Plant Biol., 2015. 15: p. 305 [PMID:26718529] - Huang Y,Feng CZ,Ye Q,Wu WH,Chen YF
Arabidopsis WRKY6 Transcription Factor Acts as a Positive Regulator of Abscisic Acid Signaling during Seed Germination and Early Seedling Development. PLoS Genet., 2016. 12(2): p. e1005833 [PMID:26829043] - Ramírez V,López A,Mauch-Mani B,Gil MJ,Vera P
Correction: An Extracellular Subtilase Switch for Immune Priming in Arabidopsis. PLoS Pathog., 2016. 12(11): p. e1006003 [PMID:27806116] - Li H, et al.
BZR1 Positively Regulates Freezing Tolerance via CBF-Dependent and CBF-Independent Pathways in Arabidopsis. Mol Plant, 2017. 10(4): p. 545-559 [PMID:28089951] - Stetter MG,Benz M,Ludewig U
Increased root hair density by loss of WRKY6 in Arabidopsis thaliana. PeerJ, 2017. 5: p. e2891 [PMID:28149680] - Zhou X, et al.
StMYB44 negatively regulates phosphate transport by suppressing expression of PHOSPHATE1 in potato. J. Exp. Bot., 2017. 68(5): p. 1265-1281 [PMID:28338870] - Bakshi M, et al.
Piriformospora indica Reprograms Gene Expression in Arabidopsis Phosphate Metabolism Mutants But Does Not Compensate for Phosphate Limitation. Front Microbiol, 2017. 8: p. 1262 [PMID:28747898] - Zhang Y, et al.
DELLA proteins negatively regulate dark-induced senescence and chlorophyll degradation in Arabidopsis through interaction with the transcription factor WRKY6. Plant Cell Rep., 2018. 37(7): p. 981-992 [PMID:29574486]
|