![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00016.177 | ||||||||
| Common Name | AMTR_s00016p00207780 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | GRAS | ||||||||
| Protein Properties | Length: 222aa MW: 24869.5 Da PI: 8.0152 | ||||||||
| Description | GRAS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | GRAS | 249.8 | 1.1e-76 | 2 | 220 | 145 | 374 |
GRAS 145 TgvgspesgskeeleetgerLakfAeelgvpfefnvlvakrledleleeLrvkpgEalaVnlvlqlhrl 213
Tg+gs + e ++etg+rLa++A++l+vpfef++ va+ le+l++++L + gEala+n v +lh++
evm_27.model.AmTr_v1.0_scaffold00016.177 2 TGLGS----QLELVRETGRRLADLAHSLRVPFEFHA-VADPLEELRPRALGRRIGEALAINAVNRLHHV 65
88888....8999***********************.8******************************* PP
GRAS 214 ldesvsleserdevLklvkslsPkvvvvveqeadhnsesFlerflealeyysalfdsleaklpreseer 282
+++l +L l+++ Pk+v++veqea+hns+ Fl rfleal+yysa fdsl+a++p++s +r
evm_27.model.AmTr_v1.0_scaffold00016.177 66 A--PHALGP----LLALFRDQAPKIVTLVEQEASHNSPYFLSRFLEALHYYSATFDSLDATFPTDSPQR 128
8..777777....******************************************************** PP
GRAS 283 ikvErellgreivnvvacegaerrerhetlekWrerleeaGFkpvplsekaakqaklllrkvksdgyrv 351
+ vE+++++ ei n+vacega+r+erhe+le+Wr+ +e GF+ vpls +a++q ++ll+ + dgyr+
evm_27.model.AmTr_v1.0_scaffold00016.177 129 ARVEKFIFAAEINNIVACEGAARVERHERLERWRRVMEGKGFRGVPLSANAVNQSRMLLSIYTCDGYRL 197
********************************************************************* PP
GRAS 352 eeesgslvlgWkdrpLvsvSaWr 374
+e+ g+l+lgW+drpL++vSaWr
evm_27.model.AmTr_v1.0_scaffold00016.177 198 NEDAGCLLLGWQDRPLIAVSAWR 220
**********************8 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| PROSITE profile | PS50985 | 37.017 | 1 | 200 | IPR005202 | Transcription factor GRAS |
| Pfam | PF03514 | 3.7E-74 | 2 | 220 | IPR005202 | Transcription factor GRAS |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 222 aa Download sequence Send to blast |
MTGLGSQLEL VRETGRRLAD LAHSLRVPFE FHAVADPLEE LRPRALGRRI GEALAINAVN 60 RLHHVAPHAL GPLLALFRDQ APKIVTLVEQ EASHNSPYFL SRFLEALHYY SATFDSLDAT 120 FPTDSPQRAR VEKFIFAAEI NNIVACEGAA RVERHERLER WRRVMEGKGF RGVPLSANAV 180 NQSRMLLSIY TCDGYRLNED AGCLLLGWQD RPLIAVSAWR C* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5b3g_A | 2e-49 | 1 | 219 | 162 | 378 | Protein SCARECROW |
| 5b3h_A | 2e-49 | 1 | 219 | 161 | 377 | Protein SCARECROW |
| 5b3h_D | 2e-49 | 1 | 219 | 161 | 377 | Protein SCARECROW |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Probable transcription factor that functions in mycorrhizal specific signaling (PubMed:23122845). Required for Myc factor signaling from mycorrhizal fungi, but has no function in Nod factor signaling from rhizobial bacteria (PubMed:23122845). Regulates the expression of RAM2, a glycerol-3-phosphate acyl transferase that promotes cutin biosynthesis to enhance mycorrhizal hyphopodia formation (PubMed:23122845). {ECO:0000269|PubMed:23122845}. | |||||
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced in roots during colonization by arbuscular mycorrhizal fungi. {ECO:0000269|PubMed:23122845}. | |||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_020523030.1 | 1e-158 | DELLA protein RGL1 | ||||
| Swissprot | G7L166 | 1e-116 | RAM1_MEDTR; GRAS family protein RAM1 | ||||
| TrEMBL | W1PEY1 | 1e-160 | W1PEY1_AMBTC; Uncharacterized protein | ||||
| STRING | ERN06264 | 1e-161 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP5366 | 13 | 22 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G66350.1 | 1e-58 | RGA-like 1 | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00016.177 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




