PlantTFDB
PlantRegMap/PlantTFDB v5.0
Plant Transcription Factor Database
Transcription Factor Information
Basic Information | Signature Domain | Sequence | 
Basic Information? help Back to Top
TF ID evm_27.model.AmTr_v1.0_scaffold00030.3
Common NameAMTR_s00030p00014690
Organism
Taxonomic ID
Taxonomic Lineage
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
Family bZIP
Protein Properties Length: 302aa    MW: 32888.5 Da    PI: 9.0088
Description bZIP family protein
Gene Model
Gene Model ID Type Source Coding Sequence
evm_27.model.AmTr_v1.0_scaffold00030.3genomeTAGPView CDS
Signature Domain? help Back to Top
Signature Domain
No. Domain Score E-value Start End HMM Start HMM End
1bZIP_131.44.1e-10141199563
                                             CHHHCHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH CS
                                  bZIP_1   5 krerrkqkNReAArrsRqRKkaeieeLeekvkeLeaeNkaLkkeleelkkevaklksev 63 
                                             kr++r   NR +A rs +RK  ++ eLe+kv++L++e ++L  +l  l+     l++e+
  evm_27.model.AmTr_v1.0_scaffold00030.3 141 KRAKRILANRQSAARSKERKIRYTSELERKVQTLQTEATTLSAQLTLLQRDTTGLTQEN 199
                                             9***********************************************99999999887 PP

Protein Features ? help Back to Top
3D Structure
Database Entry ID E-value Start End InterPro ID Description
SMARTSM003384.4E-16137201IPR004827Basic-leucine zipper domain
PROSITE profilePS5021710.932139202IPR004827Basic-leucine zipper domain
SuperFamilySSF579599.85E-11141193No hitNo description
Gene3DG3DSA:1.20.5.1701.8E-10141197No hitNo description
PfamPF001708.7E-9141199IPR004827Basic-leucine zipper domain
CDDcd147033.37E-23142191No hitNo description
Gene Ontology ? help Back to Top
GO Term GO Category GO Description
GO:0006355Biological Processregulation of transcription, DNA-templated
GO:0007231Biological Processosmosensory signaling pathway
GO:0008272Biological Processsulfate transport
GO:0009294Biological ProcessDNA mediated transformation
GO:0009970Biological Processcellular response to sulfate starvation
GO:0045596Biological Processnegative regulation of cell differentiation
GO:0051170Biological Processnuclear import
GO:0005634Cellular Componentnucleus
GO:0005829Cellular Componentcytosol
GO:0003700Molecular Functiontranscription factor activity, sequence-specific DNA binding
GO:0043565Molecular Functionsequence-specific DNA binding
GO:0051019Molecular Functionmitogen-activated protein kinase binding
Sequence ? help Back to Top
Protein Sequence    Length: 302 aa     Download sequence    Send to blast
MPETPLRGSH RRAHSDIAFR LPDDVLFDSE LDFGIAGIDI ASFSEEANSG DILAGKSEDS  60
GNGGGVKESK DFSSGSSHMR SLSVDAAFLE SLGLQGGGGE RKGGHRRVSS SGSGLELGDN  120
GEGKKVMGPD KLAELSLIDP KRAKRILANR QSAARSKERK IRYTSELERK VQTLQTEATT  180
LSAQLTLLQR DTTGLTQENK ELKLRLQAME QQAHLRDALN EALREEVQRL KVATGQIQGV  240
NGNHFNRGLQ QPNHSFFPQQ QMHSHQLPPR HVSQPSPPNN QSQHGHLDFL RGSTTNNHGA  300
Q*
Functional Description ? help Back to Top
Source Description
UniProtTranscrition factor that may participate with bZIP34 in the gametophytic control of pollen development. {ECO:0000269|PubMed:27896439}.
Regulation -- PlantRegMap ? help Back to Top
Source Upstream Regulator Target Gene
PlantRegMapRetrieve-
Annotation -- Protein ? help Back to Top
Source Hit ID E-value Description
RefseqXP_006854522.20.0transcription factor VIP1
SwissprotO228734e-63BZP18_ARATH; bZIP transcription factor 18
TrEMBLU5D0P20.0U5D0P2_AMBTC; Uncharacterized protein
STRINGERN159890.0(Amborella trichopoda)
Orthologous Group ? help Back to Top
LineageOrthologous Group IDTaxa NumberGene Number
Representative plantOGRP12617181
Best hit in Arabidopsis thaliana ? help Back to Top
Hit ID E-value Description
AT2G40620.15e-51bZIP family protein
Publications ? help Back to Top
  1. Duarte JM, et al.
    Expression pattern shifts following duplication indicative of subfunctionalization and neofunctionalization in regulatory genes of Arabidopsis.
    Mol. Biol. Evol., 2006. 23(2): p. 469-78
    [PMID:16280546]
  2. Amborella Genome Project
    The Amborella genome and the evolution of flowering plants.
    Science, 2013. 342(6165): p. 1241089
    [PMID:24357323]
  3. Pawar V, et al.
    A novel family of plant nuclear envelope-associated proteins.
    J. Exp. Bot., 2016. 67(19): p. 5699-5710
    [PMID:27630107]
  4. Gibalová A, et al.
    Characterization of pollen-expressed bZIP protein interactions and the role of ATbZIP18 in the male gametophyte.
    Plant Reprod, 2017. 30(1): p. 1-17
    [PMID:27896439]
  5. Ezer D, et al.
    The G-Box Transcriptional Regulatory Code in Arabidopsis.
    Plant Physiol., 2017. 175(2): p. 628-640
    [PMID:28864470]
  6. Babiychuk E,Fuangthong M,Van Montagu M,Inzé D,Kushnir S
    Efficient gene tagging in Arabidopsis thaliana using a gene trap approach.
    Proc. Natl. Acad. Sci. U.S.A., 1997. 94(23): p. 12722-7
    [PMID:9356517]