![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00109.70 | ||||||||
| Common Name | AMTR_s00109p00086600, LOC18426638 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | CPP | ||||||||
| Protein Properties | Length: 567aa MW: 61366 Da PI: 7.9243 | ||||||||
| Description | CPP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | TCR | 42.6 | 1.2e-13 | 72 | 111 | 2 | 42 |
TCR 2 ekkgCnCkkskClkkYCeCfaagkkCseeCkCedCkNkeek 42
+ k+CnCk+skClk+YCeCfa+g++C+ C+C +C+N+ e+
evm_27.model.AmTr_v1.0_scaffold00109.70 72 KPKQCNCKNSKCLKLYCECFASGVYCDG-CNCVNCCNNPEN 111
5699************************.********9875 PP
| |||||||
| 2 | TCR | 51.3 | 2.3e-16 | 156 | 195 | 1 | 40 |
TCR 1 kekkgCnCkkskClkkYCeCfaagkkCseeCkCedCkNke 40
k++kgC+Ckks ClkkYCeCf+a+ Cs++CkC dCkN e
evm_27.model.AmTr_v1.0_scaffold00109.70 156 KHNKGCHCKKSGCLKKYCECFQANILCSDNCKCMDCKNYE 195
589***********************************87 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SMART | SM01114 | 3.0E-14 | 71 | 111 | IPR033467 | Tesmin/TSO1-like CXC domain |
| PROSITE profile | PS51634 | 36.832 | 72 | 196 | IPR005172 | CRC domain |
| Pfam | PF03638 | 1.4E-10 | 74 | 108 | IPR005172 | CRC domain |
| SMART | SM01114 | 3.7E-20 | 156 | 197 | IPR033467 | Tesmin/TSO1-like CXC domain |
| Pfam | PF03638 | 1.4E-12 | 159 | 194 | IPR005172 | CRC domain |
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 567 aa Download sequence Send to blast |
MDKRVMESGL PQPDFPVKKL ARQLDFTAFC STSAPVTDII SRPTLPLQKP ESPRAPPRPR 60 TPFDAKDCTP KKPKQCNCKN SKCLKLYCEC FASGVYCDGC NCVNCCNNPE NEATRHEAVE 120 ATLERNPNAF RPKIASSPNA PRDSREELGE LPMVGKHNKG CHCKKSGCLK KYCECFQANI 180 LCSDNCKCMD CKNYEGSEER RALFQVDQGM HMTYLQQAAN AAITGAIGSS GYASPPINKK 240 RKNQEIFFGP GPPVKDQGVH RLGPIPQTNH IKTTSATSSS VAPVPVFKVA PPAVTAPSKF 300 TFRSLLADVV QPEYVTEFCK LLTMVSVETA KAFAVDNATK EKEIERIKSD QPENPTNSAP 360 SQNPDNGPKP LDDRKPTDER SSTNQAVKTN GEDSSSSDAG EGQKGRPMSP STLALMCDEQ 420 DTLFSAAASP SGANPKRFPY SQGSTELYGD QEMMVLTEFR DCLRKLVTVG RMKEAQFSTY 480 ATKIETPASH QEPDGNGPVQ APEAAQRLGE PTIQATPLAR NSTHFASNSS HFSGNSVPAT 540 SSNPTLTTNV GDPVVNGENK AQASNK* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5fd3_A | 1e-29 | 70 | 206 | 10 | 133 | Protein lin-54 homolog |
| 5fd3_B | 1e-29 | 70 | 206 | 10 | 133 | Protein lin-54 homolog |
| Search in ModeBase | ||||||
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Plays a role in development of both male and female reproductive tissues. {ECO:0000250}. | |||||
| Binding Motif ? help Back to Top | |||
|---|---|---|---|
| Motif ID | Method | Source | Motif file |
| MP00045 | PBM | Transfer from AT4G29000 | Download |
| |||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | Retrieve | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_006833343.1 | 0.0 | protein tesmin/TSO1-like CXC 5 | ||||
| Swissprot | Q9SZD1 | 1e-152 | TCX5_ARATH; Protein tesmin/TSO1-like CXC 5 | ||||
| TrEMBL | W1NPJ3 | 0.0 | W1NPJ3_AMBTC; Uncharacterized protein | ||||
| STRING | ERM98621 | 0.0 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP1469 | 17 | 45 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G29000.1 | 1e-134 | Tesmin/TSO1-like CXC domain-containing protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00109.70 |
| Entrez Gene | 18426638 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




