![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00118.34 | ||||||||
| Common Name | AMTR_s00118p00133040 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 127aa MW: 13980.6 Da PI: 8.3226 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 18.2 | 6.7e-06 | 61 | 86 | 1 | 23 |
EEET..TTTEEESSHHHHHHHHHH.T CS
zf-C2H2 1 ykCp..dCgksFsrksnLkrHirt.H 23
y Cp C+ks+ +k+ L+ H+++ H
evm_27.model.AmTr_v1.0_scaffold00118.34 61 YNCPyeGCDKSYIHKYKLNLHLKRkH 86
89*********************999 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| SuperFamily | SSF57667 | 2.19E-5 | 57 | 84 | No hit | No description |
| Gene3D | G3DSA:3.30.160.60 | 7.0E-7 | 58 | 86 | IPR013087 | Zinc finger C2H2-type/integrase DNA-binding domain |
| SMART | SM00355 | 0.0019 | 61 | 86 | IPR015880 | Zinc finger, C2H2-like |
| PROSITE profile | PS50157 | 10.097 | 61 | 91 | IPR007087 | Zinc finger, C2H2 |
| PROSITE pattern | PS00028 | 0 | 63 | 86 | IPR007087 | Zinc finger, C2H2 |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0003676 | Molecular Function | nucleic acid binding | ||||
| GO:0046872 | Molecular Function | metal ion binding | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 127 aa Download sequence Send to blast |
MKVKIPSPAV VAYIFHLSKR YWEISNNLST DVKLTPQAEK PHNTPKTPAL VCGSASSDCP 60 YNCPYEGCDK SYIHKYKLNL HLKRKHPGHN SEENGKHNVN AENEVDEGSD PDAYNALKSG 120 NGNSTK* |
| Functional Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | Dual-function transcription factor with both repression and activation activities. Binds to 5'-CCATATT-3' motif in target gene promoters (e.g. ABR1) (PubMed:26961720). Binds also to G-rich DNA motif 5'-GGGGGCAGTGG-3' (PubMed:22508367). Regulates the expression of genes involved in diverse cellular pathways, including glucose metabolism, photosynthesis, phototropism and stress response (e.g. salt, drought and osmotic stress) (PubMed:22508367, PubMed:26961720). Regulates plant immunity, especially during necrotrophic fungal infection (e.g. B.cinerea) (PubMed:24451981). Binds to ABR1 promoter and promotes its expression, thus negatively regulating the abscisic acid (ABA) signaling pathway. Represses ABA- and salt-responsive genes expression (PubMed:26961720). {ECO:0000269|PubMed:22508367, ECO:0000269|PubMed:24451981, ECO:0000269|PubMed:26961720}. | |||||
| Regulation -- Description ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Description | |||||
| UniProt | INDUCTION: Induced by abscisic acid (ABA) in an ABI1- and ABI4-dependent manner. Stimulated by stress conditions including high salt, osmotic stress (e.g. mannitol) and dehydration. May be induced by ABI4 but repressed by ABR1. Repressed by darkness but induced by light. {ECO:0000269|PubMed:26961720}. | |||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_020517871.1 | 2e-89 | uncharacterized zinc finger protein At4g06634-like | ||||
| Swissprot | Q2V3L3 | 3e-27 | YY1_ARATH; Zinc finger transcription factor YY1 | ||||
| TrEMBL | W1NQ41 | 5e-88 | W1NQ41_AMBTC; Uncharacterized protein | ||||
| STRING | ERM97852 | 9e-89 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP3856 | 16 | 26 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G06634.2 | 8e-30 | C2H2 family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00118.34 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




