PlantTFDB
PlantRegMap/PlantTFDB v5.0
Plant Transcription Factor Database
Transcription Factor Information
Basic Information | Signature Domain | Sequence | 
Basic Information? help Back to Top
TF ID evm_27.model.AmTr_v1.0_scaffold00119.91
Common NameAMTR_s00119p00117410
Organism
Taxonomic ID
Taxonomic Lineage
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
Family EIL
Protein Properties Length: 638aa    MW: 71361 Da    PI: 5.8444
Description EIL family protein
Gene Model
Gene Model ID Type Source Coding Sequence
evm_27.model.AmTr_v1.0_scaffold00119.91genomeTAGPView CDS
Signature Domain? help Back to Top
Signature Domain
No. Domain Score E-value Start End HMM Start HMM End
1EIN3487.38.7e-149494061353
                                              XXXXXXXXXXXXXXXXXXXXXXX..XXXXX.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX CS
                                     EIN3   1 eelkkrmwkdqmllkrlkerkkqlledkeaatgakksnksneqarrkkmsraQDgiLkYMlkemevcnaq 70 
                                              +el++rmw+d+ +l+rlke++k + e++    + +k+++s+eqarrkkmsraQDgiLkYMlk+mevc+aq
  evm_27.model.AmTr_v1.0_scaffold00119.91  49 DELERRMWRDKLRLRRLKEQSKGK-EAMG--GDLAKQRQSQEQARRKKMSRAQDGILKYMLKMMEVCKAQ 115
                                              79********************84.2333..68999********************************** PP

                                              XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX....XX----STTS- CS
                                     EIN3  71 GfvYgiipekgkpvegasdsLraWWkekvefdrngpaaiskyqaknlilsgesslqtersseshslselq 140
                                              GfvYgiipekgkpv+gasd+LraWWkekv+fdrngpaai+kyqa+n+i++ ++++ +   s++h+l+elq
  evm_27.model.AmTr_v1.0_scaffold00119.91 116 GFVYGIIPEKGKPVSGASDNLRAWWKEKVRFDRNGPAAIAKYQADNAIPGISDEN-SGMASTPHTLQELQ 184
                                              *************************************************988877.4599********** PP

                                              HHHHHHHHHHHSSSSSS-TTS--TTT--HHHH---S--HHHHHHT--TT--.-----GGG--HHHHHHHH CS
                                     EIN3 141 DTtlgSLLsalmqhcdppqrrfplekgvepPWWPtGkelwwgelglskdqgtppykkphdlkkawkvsvL 210
                                              DTtlgSLLsalmqhcdppqrr+plekg++pPWWPtG+e+ww++lgl+k qg+ppykkphdlkkawkvsvL
  evm_27.model.AmTr_v1.0_scaffold00119.91 185 DTTLGSLLSALMQHCDPPQRRYPLEKGIAPPWWPTGNEEWWPQLGLPKGQGPPPYKKPHDLKKAWKVSVL 254
                                              ********************************************************************** PP

                                              HHHHHHTGGGHHHHHHTTTTSSSSTTT--SHHHHHHHHHHTTTTT-S--XXXX....XXXXXXXXXXXXX CS
                                     EIN3 211 tavikhmsptieeirelerqskylqdkmsakesfallsvlnqeekecatvsah....ssslrkqspkvtl 276
                                              tavikhmsp+i++ir+l+rqsk+lqdkm+akes+++l+v+nqee++ ++  ++    sss++    ++ +
  evm_27.model.AmTr_v1.0_scaffold00119.91 255 TAVIKHMSPDIAKIRKLVRQSKCLQDKMTAKESATWLAVVNQEEALSRQQNPDacppSSSSNGMGLSLLA 324
                                              *************************************************999987432222223333333 PP

                                              XXXXXXXXX............XXXXXX.XXXXXXXXXX.......XXXXXXXXXXXXXXXXXXXXX.... CS
                                     EIN3 277 sceqkedve............gkkeskikhvqavktta.......gfpvvrkrkkkpsesakvsskevsr 327
                                                 +  +v+                         k++        ++++vrkrk  p+e   v +k  ++
  evm_27.model.AmTr_v1.0_scaffold00119.91 325 APVTTMEVQeikpdvdlfnlgM-----------GKERLlppikseTADFVRKRK-LPTEVIVVDQK--IY 380
                                              3333444443222222554432...........222224455544789*****9.78888888777..7* PP

                                              ..XXXXXXX.XXXXXXXXXXXXXXXX CS
                                     EIN3 328 tcqssqfrgsetelifadknsisqne 353
                                              tc++ q+++++++l+f dkns ++++
  evm_27.model.AmTr_v1.0_scaffold00119.91 381 TCDNVQCPSHQYQLGFLDKNSKNNHQ 406
                                              ***********************998 PP

Protein Features ? help Back to Top
3D Structure
Database Entry ID E-value Start End InterPro ID Description
PfamPF048731.8E-13149298No hitNo description
Gene3DG3DSA:1.10.3180.105.4E-76172308IPR023278Ethylene insensitive 3-like protein, DNA-binding domain
SuperFamilySSF1167681.96E-62177301IPR023278Ethylene insensitive 3-like protein, DNA-binding domain
Gene Ontology ? help Back to Top
GO Term GO Category GO Description
GO:0001666Biological Processresponse to hypoxia
GO:0006355Biological Processregulation of transcription, DNA-templated
GO:0009873Biological Processethylene-activated signaling pathway
GO:0042742Biological Processdefense response to bacterium
GO:0071281Biological Processcellular response to iron ion
GO:0005634Cellular Componentnucleus
GO:0000976Molecular Functiontranscription regulatory region sequence-specific DNA binding
GO:0003700Molecular Functiontranscription factor activity, sequence-specific DNA binding
Sequence ? help Back to Top
Protein Sequence    Length: 638 aa     Download sequence    Send to blast
MGIYEEMGFP CNFDIMPQPT EVDPTVENEG EAAMIQDDDD SEDEMIDVDE LERRMWRDKL  60
RLRRLKEQSK GKEAMGGDLA KQRQSQEQAR RKKMSRAQDG ILKYMLKMME VCKAQGFVYG  120
IIPEKGKPVS GASDNLRAWW KEKVRFDRNG PAAIAKYQAD NAIPGISDEN SGMASTPHTL  180
QELQDTTLGS LLSALMQHCD PPQRRYPLEK GIAPPWWPTG NEEWWPQLGL PKGQGPPPYK  240
KPHDLKKAWK VSVLTAVIKH MSPDIAKIRK LVRQSKCLQD KMTAKESATW LAVVNQEEAL  300
SRQQNPDACP PSSSSNGMGL SLLAAPVTTM EVQEIKPDVD LFNLGMGKER LLPPIKSETA  360
DFVRKRKLPT EVIVVDQKIY TCDNVQCPSH QYQLGFLDKN SKNNHQSNCP FASEIHQGMG  420
LPLPRPDIGK EKPVFPLPNF TQPLQAMSGN GNGFLGNDSN KFLTGNDGSN NMTAMTPAIV  480
NNSDDLPDLG LPLDGQKRIK DILDSYNFNP SLQPNRNNPN HGTGMEIHNQ RTLIDINMDL  540
VNPPINGFRP ANEENMFGHG AMMGGNHNGF DIYFRDDLPL DPCKVFDQGY EQNSHDVNAE  600
FKFGAPYNVG MDFGIPFMKT PEALRKPEAP IWYFTGP*
3D Structure ? help Back to Top
Structure
PDB ID Evalue Query Start Query End Hit Start Hit End Description
4zds_A3e-781753081134Protein ETHYLENE INSENSITIVE 3
4zds_B3e-781753081134Protein ETHYLENE INSENSITIVE 3
Search in ModeBase
Functional Description ? help Back to Top
Source Description
UniProtProbable transcription factor acting as a positive regulator in the ethylene response pathway. Is required for ethylene responsiveness in adult plant tissues. Binds a primary ethylene response element present in the ETHYLENE-RESPONSE-FACTOR1 promoter with consequence to activate the transcription of this gene. {ECO:0000269|PubMed:9215635, ECO:0000269|PubMed:9851977}.
Binding Motif ? help Back to Top
Motif ID Method Source Motif file
MP00367DAPTransfer from AT3G20770Download
Motif logo
Regulation -- PlantRegMap ? help Back to Top
Source Upstream Regulator Target Gene
PlantRegMapRetrieveRetrieve
Annotation -- Protein ? help Back to Top
Source Hit ID E-value Description
RefseqXP_020517603.10.0LOW QUALITY PROTEIN: ETHYLENE INSENSITIVE 3-like 1 protein
SwissprotO246060.0EIN3_ARATH; Protein ETHYLENE INSENSITIVE 3
TrEMBLW1NR070.0W1NR07_AMBTC; Uncharacterized protein
STRINGERM972640.0(Amborella trichopoda)
Orthologous Group ? help Back to Top
LineageOrthologous Group IDTaxa NumberGene Number
Representative plantOGRP5631682
Best hit in Arabidopsis thaliana ? help Back to Top
Hit ID E-value Description
AT3G20770.11e-149EIL family protein
Publications ? help Back to Top
  1. Duarte JM, et al.
    Expression pattern shifts following duplication indicative of subfunctionalization and neofunctionalization in regulatory genes of Arabidopsis.
    Mol. Biol. Evol., 2006. 23(2): p. 469-78
    [PMID:16280546]
  2. Kim HG, et al.
    GDSL LIPASE1 modulates plant immunity through feedback regulation of ethylene signaling.
    Plant Physiol., 2013. 163(4): p. 1776-91
    [PMID:24170202]
  3. Amborella Genome Project
    The Amborella genome and the evolution of flowering plants.
    Science, 2013. 342(6165): p. 1241089
    [PMID:24357323]
  4. Zhong S, et al.
    Ethylene-orchestrated circuitry coordinates a seedling's response to soil cover and etiolated growth.
    Proc. Natl. Acad. Sci. U.S.A., 2014. 111(11): p. 3913-20
    [PMID:24599595]
  5. Kim HG, et al.
    GDSL lipase 1 regulates ethylene signaling and ethylene-associated systemic immunity in Arabidopsis.
    FEBS Lett., 2014. 588(9): p. 1652-8
    [PMID:24631536]
  6. Jourda C, et al.
    Expansion of banana (Musa acuminata) gene families involved in ethylene biosynthesis and signalling after lineage-specific whole-genome duplications.
    New Phytol., 2014. 202(3): p. 986-1000
    [PMID:24716518]
  7. Zhang GB,Yi HY,Gong JM
    The Arabidopsis ethylene/jasmonic acid-NRT signaling module coordinates nitrate reallocation and the trade-off between growth and environmental adaptation.
    Plant Cell, 2014. 26(10): p. 3984-98
    [PMID:25326291]
  8. Wang J, et al.
    Arabidopsis ROOT HAIR DEFECTIVE3 is involved in nitrogen starvation-induced anthocyanin accumulation.
    J Integr Plant Biol, 2015. 57(8): p. 708-21
    [PMID:25494721]
  9. Ge XM, et al.
    Heterotrimeric G protein mediates ethylene-induced stomatal closure via hydrogen peroxide synthesis in Arabidopsis.
    Plant J., 2015. 82(1): p. 138-50
    [PMID:25704455]
  10. Kazan K
    Diverse roles of jasmonates and ethylene in abiotic stress tolerance.
    Trends Plant Sci., 2015. 20(4): p. 219-29
    [PMID:25731753]
  11. Yang C, et al.
    MAOHUZI6/ETHYLENE INSENSITIVE3-LIKE1 and ETHYLENE INSENSITIVE3-LIKE2 Regulate Ethylene Response of Roots and Coleoptiles and Negatively Affect Salt Tolerance in Rice.
    Plant Physiol., 2015. 169(1): p. 148-65
    [PMID:25995326]
  12. Contreras-Cornejo HA, et al.
    Mitogen-Activated Protein Kinase 6 and Ethylene and Auxin Signaling Pathways Are Involved in Arabidopsis Root-System Architecture Alterations by Trichoderma atroviride.
    Mol. Plant Microbe Interact., 2015. 28(6): p. 701-10
    [PMID:26067203]
  13. Li J,Xu HH,Liu WC,Zhang XW,Lu YT
    Ethylene Inhibits Root Elongation during Alkaline Stress through AUXIN1 and Associated Changes in Auxin Accumulation.
    Plant Physiol., 2015. 168(4): p. 1777-91
    [PMID:26109425]
  14. Street IH, et al.
    Ethylene Inhibits Cell Proliferation of the Arabidopsis Root Meristem.
    Plant Physiol., 2015. 169(1): p. 338-50
    [PMID:26149574]
  15. Ju C,Chang C
    Mechanistic Insights in Ethylene Perception and Signal Transduction.
    Plant Physiol., 2015. 169(1): p. 85-95
    [PMID:26246449]
  16. Qing D, et al.
    Quantitative and Functional Phosphoproteomic Analysis Reveals that Ethylene Regulates Water Transport via the C-Terminal Phosphorylation of Aquaporin PIP2;1 in Arabidopsis.
    Mol Plant, 2016. 9(1): p. 158-174
    [PMID:26476206]
  17. Zhang Y,Liu J,Chai J,Xing D
    Mitogen-activated protein kinase 6 mediates nuclear translocation of ORE3 to promote ORE9 gene expression in methyl jasmonate-induced leaf senescence.
    J. Exp. Bot., 2016. 67(1): p. 83-94
    [PMID:26507893]
  18. Li X,Pan Y,Chang B,Wang Y,Tang Z
    NO Promotes Seed Germination and Seedling Growth Under High Salt May Depend on EIN3 Protein in Arabidopsis.
    Front Plant Sci, 2015. 6: p. 1203
    [PMID:26779234]
  19. Yu Y, et al.
    Salt Stress and Ethylene Antagonistically Regulate Nucleocytoplasmic Partitioning of COP1 to Control Seed Germination.
    Plant Physiol., 2016. 170(4): p. 2340-50
    [PMID:26850275]
  20. Pelagio-Flores R,Ruiz-Herrera LF,López-Bucio J
    Serotonin modulates Arabidopsis root growth via changes in reactive oxygen species and jasmonic acid-ethylene signaling.
    Physiol Plant, 2016. 158(1): p. 92-105
    [PMID:26864878]
  21. Tao S, et al.
    The THO/TREX Complex Active in miRNA Biogenesis Negatively Regulates Root-Associated Acid Phosphatase Activity Induced by Phosphate Starvation.
    Plant Physiol., 2016. 171(4): p. 2841-53
    [PMID:27329222]
  22. Song L, et al.
    The Molecular Mechanism of Ethylene-Mediated Root Hair Development Induced by Phosphate Starvation.
    PLoS Genet., 2016. 12(7): p. e1006194
    [PMID:27427911]
  23. Jeong J, et al.
    Phytochrome and Ethylene Signaling Integration in Arabidopsis Occurs via the Transcriptional Regulation of Genes Co-targeted by PIFs and EIN3.
    Front Plant Sci, 2016. 7: p. 1055
    [PMID:27486469]
  24. Tsai KJ,Lin CY,Ting CY,Shih MC
    Ethylene-Regulated Glutamate Dehydrogenase Fine-Tunes Metabolism during Anoxia-Reoxygenation.
    Plant Physiol., 2016. 172(3): p. 1548-1562
    [PMID:27677986]
  25. Zhang F, et al.
    EIN2-dependent regulation of acetylation of histone H3K14 and non-canonical histone H3K23 in ethylene signalling.
    Nat Commun, 2016. 7: p. 13018
    [PMID:27694846]
  26. Liu G, et al.
    Local Transcriptional Control of YUCCA Regulates Auxin Promoted Root-Growth Inhibition in Response to Aluminium Stress in Arabidopsis.
    PLoS Genet., 2016. 12(10): p. e1006360
    [PMID:27716807]
  27. Shen X,Li Y,Pan Y,Zhong S
    Activation of HLS1 by Mechanical Stress via Ethylene-Stabilized EIN3 Is Crucial for Seedling Soil Emergence.
    Front Plant Sci, 2016. 7: p. 1571
    [PMID:27822221]
  28. Shi H, et al.
    The Red Light Receptor Phytochrome B Directly Enhances Substrate-E3 Ligase Interactions to Attenuate Ethylene Responses.
    Dev. Cell, 2016. 39(5): p. 597-610
    [PMID:27889482]
  29. Wawrzyńska A,Sirko A
    EIN3 interferes with the sulfur deficiency signaling in Arabidopsis thaliana through direct interaction with the SLIM1 transcription factor.
    Plant Sci., 2016. 253: p. 50-57
    [PMID:27968996]
  30. Zemlyanskaya EV,Levitsky VG,Oshchepkov DY,Grosse I,Mironova VV
    The Interplay of Chromatin Landscape and DNA-Binding Context Suggests Distinct Modes of EIN3 Regulation in Arabidopsis thaliana.
    Front Plant Sci, 2016. 7: p. 2044
    [PMID:28119721]
  31. He X,Jiang J,Wang CQ,Dehesh K
    ORA59 and EIN3 interaction couples jasmonate-ethylene synergistic action to antagonistic salicylic acid regulation of PDF expression.
    J Integr Plant Biol, 2017. 59(4): p. 275-287
    [PMID:28168848]
  32. Abozeid A, et al.
    Ethylene Improves Root System Development under Cadmium Stress by Modulating Superoxide Anion Concentration in Arabidopsis thaliana.
    Front Plant Sci, 2017. 8: p. 253
    [PMID:28286514]
  33. Quan R, et al.
    EIN3 and SOS2 synergistically modulate plant salt tolerance.
    Sci Rep, 2017. 7: p. 44637
    [PMID:28300216]
  34. Kim GD,Cho YH,Yoo SD
    Regulatory Functions of Cellular Energy Sensor SNF1-Related Kinase1 for Leaf Senescence Delay through ETHYLENE- INSENSITIVE3 Repression.
    Sci Rep, 2017. 7(1): p. 3193
    [PMID:28600557]
  35. Liu Y, et al.
    Light and Ethylene Coordinately Regulate the Phosphate Starvation Response through Transcriptional Regulation of PHOSPHATE STARVATION RESPONSE1.
    Plant Cell, 2017. 29(9): p. 2269-2284
    [PMID:28842534]
  36. Liu X,Li Y,Zhong S
    Interplay between Light and Plant Hormones in the Control of Arabidopsis Seedling Chlorophyll Biosynthesis.
    Front Plant Sci, 2017. 8: p. 1433
    [PMID:28861105]
  37. Zhang F, et al.
    EIN2 mediates direct regulation of histone acetylation in the ethylene response.
    Proc. Natl. Acad. Sci. U.S.A., 2017. 114(38): p. 10274-10279
    [PMID:28874528]
  38. Yan Z, et al.
    Type B Response Regulators Act As Central Integrators in Transcriptional Control of the Auxin Biosynthesis Enzyme TAA1.
    Plant Physiol., 2017. 175(3): p. 1438-1454
    [PMID:28931628]
  39. Liu X, et al.
    EIN3 and PIF3 Form an Interdependent Module That Represses Chloroplast Development in Buried Seedlings.
    Plant Cell, 2017. 29(12): p. 3051-3067
    [PMID:29114016]
  40. Feng Y, et al.
    Ethylene promotes root hair growth through coordinated EIN3/EIL1 and RHD6/RSL1 activity in Arabidopsis.
    Proc. Natl. Acad. Sci. U.S.A., 2017. 114(52): p. 13834-13839
    [PMID:29233944]
  41. Harkey AF, et al.
    Identification of Transcriptional and Receptor Networks That Control Root Responses to Ethylene.
    Plant Physiol., 2018. 176(3): p. 2095-2118
    [PMID:29259106]
  42. Zhang F,Wang L,Ko EE,Shao K,Qiao H
    Histone Deacetylases SRT1 and SRT2 Interact with ENAP1 to Mediate Ethylene-Induced Transcriptional Repression.
    Plant Cell, 2018. 30(1): p. 153-166
    [PMID:29298835]
  43. Lv B, et al.
    Brassinosteroids regulate root growth by controlling reactive oxygen species homeostasis and dual effect on ethylene synthesis in Arabidopsis.
    PLoS Genet., 2018. 14(1): p. e1007144
    [PMID:29324765]
  44. Dou L,He K,Higaki T,Wang X,Mao T
    Ethylene Signaling Modulates Cortical Microtubule Reassembly in Response to Salt Stress.
    Plant Physiol., 2018. 176(3): p. 2071-2081
    [PMID:29431630]
  45. Meng LS,Xu MK,Wan W,Wang JY
    Integration of Environmental and Developmental (or Metabolic) Control of Seed Mass by Sugar and Ethylene Metabolisms in Arabidopsis.
    J. Agric. Food Chem., 2018. 66(13): p. 3477-3488
    [PMID:29528636]
  46. Munné-Bosch S,Simancas B,Müller M
    Ethylene signaling cross-talk with other hormones in Arabidopsis thaliana exposed to contrasting phosphate availability: Differential effects in roots, leaves and fruits.
    J. Plant Physiol., 2018. 226: p. 114-122
    [PMID:29758376]