![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm_27.model.AmTr_v1.0_scaffold00122.72 | ||||||||
| Common Name | AMTR_s00122p00135250 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; basal Magnoliophyta; Amborellales; Amborellaceae; Amborella
|
||||||||
| Family | GRAS | ||||||||
| Protein Properties | Length: 475aa MW: 53617.1 Da PI: 6.3666 | ||||||||
| Description | GRAS family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | GRAS | 325.4 | 1.1e-99 | 132 | 438 | 1 | 321 |
GRAS 1 lvelLlecAeavssgdlelaqalLarlselaspdg.dpmqRlaayfteALaarlarsvselykalppset 69
l++lL++cA v+ g+ e a +l+++++ l + + ++a +f+ AL rl++ ++
evm_27.model.AmTr_v1.0_scaffold00122.72 132 LIHLLMSCAGSVERGEREIALKLVQEMRLLLCRNItGVIGKVAVFFVDALFWRLSG-----------HPS 190
689***************************555553899*****************...........344 PP
GRAS 70 seknsseelaalklfsevsPilkfshltaNqaIleavegeervHiiDfdisqGlQWpaLlqaLasRpegp 139
++ +s e+ + ++ f+e +P+lkf+h+t+NqaIlea++g+++vH+iDf++ +GlQWpaL+qaLa Rp+gp
evm_27.model.AmTr_v1.0_scaffold00122.72 191 NRVDSGESEFLYHHFYEGCPYLKFAHFTCNQAILEAFDGCDEVHVIDFNLIHGLQWPALIQALALRPGGP 260
4445778888999********************************************************* PP
GRAS 140 pslRiTgvgspesgskeeleetgerLakfAeelgvpfefnvlvakrledleleeLrvkpgEalaVnlvlq 209
p lR+Tg+g+p+++ +++++e+g rLa++A++++v+f f+ ++++rledl++++++v++ E++aVn+v+
evm_27.model.AmTr_v1.0_scaffold00122.72 261 PFLRLTGIGPPSPDGRDTIREVGIRLAELARSVNVRFAFRGVATQRLEDLKPWMIHVRSTETVAVNSVFV 330
*****************************************9999************************* PP
GRAS 210 lhrlldesvsleserdevLklvkslsPkvvvvveqeadhnsesFlerflealeyysalfdsleaklpres 279
lhrll + +++++++ vL+ v++l Pk+++vveqea+hn+ F++rf+eal+yysa+fds+e + +
evm_27.model.AmTr_v1.0_scaffold00122.72 331 LHRLLYTTPDQTQPIKPVLNWVRELGPKILTVVEQEASHNGLGFVDRFTEALHYYSAMFDSMEGS----N 396
***************************************************************99....7 PP
GRAS 280 eerikvErellgreivnvvacegaerrerhetlekWrerlee 321
++++ + +l+rei+n+v+ceg+er+erhe l +Wr r+++
evm_27.model.AmTr_v1.0_scaffold00122.72 397 RNNQAFAELYLEREIKNIVCCEGSERVERHEPLTRWRGRFDK 438
8888888899*****************************986 PP
| |||||||
| Protein Features ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Database | Entry ID | E-value | Start | End | InterPro ID | Description |
| Pfam | PF12041 | 6.2E-32 | 21 | 87 | IPR021914 | Transcriptional factor DELLA, N-terminal |
| SMART | SM01129 | 5.0E-22 | 21 | 94 | No hit | No description |
| PROSITE profile | PS50985 | 53.333 | 106 | 471 | IPR005202 | Transcription factor GRAS |
| Pfam | PF03514 | 4.0E-97 | 132 | 438 | IPR005202 | Transcription factor GRAS |
| Gene Ontology ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| GO Term | GO Category | GO Description | ||||
| GO:0006355 | Biological Process | regulation of transcription, DNA-templated | ||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 475 aa Download sequence Send to blast |
MDYPFKTFPS TPSPPSKPEI DGLLADAGYR IKASDLPHVA HRLEQLETQM INAQPTEMTH 60 LASETVHYNP SDLATWVESM LFELNPSEIP ATSGFAGESQ SPEIGFFAGN QNRGSFSGAA 120 ILTHEEDSGI RLIHLLMSCA GSVERGEREI ALKLVQEMRL LLCRNITGVI GKVAVFFVDA 180 LFWRLSGHPS NRVDSGESEF LYHHFYEGCP YLKFAHFTCN QAILEAFDGC DEVHVIDFNL 240 IHGLQWPALI QALALRPGGP PFLRLTGIGP PSPDGRDTIR EVGIRLAELA RSVNVRFAFR 300 GVATQRLEDL KPWMIHVRST ETVAVNSVFV LHRLLYTTPD QTQPIKPVLN WVRELGPKIL 360 TVVEQEASHN GLGFVDRFTE ALHYYSAMFD SMEGSNRNNQ AFAELYLERE IKNIVCCEGS 420 ERVERHEPLT RWRGRFDKQD SNRLDSVRMR LDRRVCCSLF FRKMDLGWRR GMDA* |
| 3D Structure ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| PDB ID | Evalue | Query Start | Query End | Hit Start | Hit End | Description |
| 5b3h_A | 1e-42 | 125 | 422 | 11 | 310 | Protein SCARECROW |
| 5b3h_D | 1e-42 | 125 | 422 | 11 | 310 | Protein SCARECROW |
| Search in ModeBase | ||||||
| Regulation -- PlantRegMap ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Source | Upstream Regulator | Target Gene | ||||
| PlantRegMap | Retrieve | - | ||||
| Annotation -- Protein ? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| Source | Hit ID | E-value | Description | ||||
| Refseq | XP_006829673.3 | 0.0 | LOW QUALITY PROTEIN: DELLA protein RHT-1 | ||||
| TrEMBL | W1NQJ9 | 0.0 | W1NQJ9_AMBTC; Uncharacterized protein | ||||
| STRING | ERM97089 | 0.0 | (Amborella trichopoda) | ||||
| Orthologous Group ? help Back to Top | |||
|---|---|---|---|
| Lineage | Orthologous Group ID | Taxa Number | Gene Number |
| Representative plant | OGRP1251 | 15 | 50 |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G14920.1 | 1e-128 | GRAS family protein | ||||
| Link Out ? help Back to Top | |
|---|---|
| Phytozome | evm_27.model.AmTr_v1.0_scaffold00122.72 |
| Publications ? help Back to Top | |||
|---|---|---|---|
|
|||




