![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_01.2987 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 331aa MW: 37970.3 Da PI: 4.6514 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 53.3 | 6.8e-17 | 193 | 242 | 1 | 54 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkle 54
s ykGVr++ +g+W+AeIrdp +r +r +lg++ taeeAa+a+ +a++++
evm.model.AsparagusV1_01.2987 193 SLYKGVRRRA-WGKWAAEIRDP----IRkARRWLGTYNTAEEAAEAYREAARQIQ 242
57*****777.**********7....246**********************9875 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 331 aa Download sequence |
MAETNNKRER ENENEEEVPE AKRIREDLLF DILDDGSEPD NTDLDSVMRS LEKEIAIPAS 60 HLETKQPDLG FLLEASDDEL PTWRRRRWGL DQEAMSNSTR KKKEKKPSPQ QQVRRIRVIF 120 DDPDLTESSG DEEEEEEEKK PVEIEKTKRK RAVVEFSISW PKPFKNAPRP NKAKRVVAQL 180 RPTKAPSRPK RSSLYKGVRR RAWGKWAAEI RDPIRKARRW LGTYNTAEEA AEAYREAARQ 240 IQEEKIAIES NEGVENIKFS HSSPISVLDE PDPGTKAEDD PITEGLLCSC MADGEFDDLA 300 GLDFGFWGFK DADEIPSLDS IVLDWMDDKF * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 84 | 103 | RRRRWGLDQEAMSNSTRKKK |
| 2 | 85 | 104 | RRRRWGLDQEAMSNSTRKKK |
| 3 | 100 | 105 | RKKKEK |
| 4 | 148 | 174 | KRKRAVVEFSISWPKPFKNAPRPNKAK |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G72360.1 | 1e-13 | ERF family protein | ||||




