![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_02.1212 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 378aa MW: 41674.7 Da PI: 4.4686 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 37.5 | 4.3e-12 | 187 | 230 | 6 | 54 |
HHHHHHHHHHHHHHHHHHHCTSCC.C...TTS-STCHHHHHHHHHHHHHH CS
HLH 6 nerErrRRdriNsafeeLrellPk.askapskKlsKaeiLekAveYIksL 54
++ErrRR+++N+++ Lr+++Pk + K++ a+iL AveY+k+L
evm.model.AsparagusV1_02.1212 187 LMAERRRRKKLNDRLYMLRSVVPKiS------KMDRASILGDAVEYLKEL 230
589*********************66......****************98 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 378 aa Download sequence |
MEQQREIKQE EEPNPLFNLA PTMEEEDPLP TFTSLLGYTT NCNNTISNSD WYLTEPLQNH 60 QESFSSLLST NPFGLDPFGL SAPLSFTDLN PIAQFQTTHL PETGFQAFET PKFVNGSKFV 120 RPAEANPSIG AQPTLIGEEN EEEGVEDGSF DGSGLNCEFE ENVKSLDNNE SNERRRKRNG 180 AAPAKNLMAE RRRRKKLNDR LYMLRSVVPK ISKMDRASIL GDAVEYLKEL LQKINDLTNE 240 LESTSSSPSV LPTDTTSFQP LTPRPLTLPC RVKEDLSPSP SPLPSPIGQP TTVEVKMTDD 300 QAVNIHMLCS RRPGLLLSTL RALDALGLNI QQAVISCFNG FSLDVFQAEQ CNDGSCALPE 360 DIKSVLLHSA GSHGTLY* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 174 | 196 | RRRKRNGAAPAKNLMAERRRRKK |
| 2 | 175 | 197 | RRRKRNGAAPAKNLMAERRRRKK |
| 3 | 176 | 196 | RKRNGAAPAKNLMAERRRRKK |
| 4 | 176 | 198 | RRRKRNGAAPAKNLMAERRRRKK |
| 5 | 190 | 197 | ERRRRKKL |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G26744.1 | 5e-69 | bHLH family protein | ||||




