![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_03.2048 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 211aa MW: 23425 Da PI: 8.8167 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 11.6 | 0.00085 | 170 | 192 | 1 | 23 |
EEETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCpdCgksFsrksnLkrHirtH 23
++C++Cg+ F++ L H r+H
evm.model.AsparagusV1_03.2048 170 HECSICGRLFRSGQALGGHKRSH 192
78******************999 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 211 aa Download sequence |
MDQDRKLQCQ FCPKFFPCAR SLDDHMSIHV PPLAAAGYGL RGKPKRTTSF GDLQCAENSE 60 GRMKSHSQRT QGAKEEDDER SLSKKQRRIS SEYPKEKVDG AIALMKLSRD KRKRGNGAPE 120 YSDENPAKHQ ELSFEDEDDD SLKRRRRKKK SGSNGLEADG DRDEAEGLGH ECSICGRLFR 180 SGQALGGHKR SHSSKVAPKI VDHDADLGGQ * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 142 | 149 | LKRRRRKK |
| 2 | 143 | 148 | KRRRRK |
| 3 | 143 | 149 | KRRRRKK |
| 4 | 144 | 150 | KRRRRKK |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT1G26590.1 | 1e-09 | C2H2 family protein | ||||




