![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_03.2050 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 198aa MW: 21694.3 Da PI: 10.4763 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 18.8 | 4.6e-06 | 42 | 63 | 2 | 23 |
EETTTTEEESSHHHHHHHHHHT CS
zf-C2H2 2 kCpdCgksFsrksnLkrHirtH 23
+C+ Cg+ F+++ L H+++H
evm.model.AsparagusV1_03.2050 42 QCGECGREFKSRRALFGHMSSH 63
7*******************99 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 198 aa Download sequence |
MDQDRSLGRH VRSPVPPPDP GGYRLREKPK RTTGFDDIGE NQCGECGREF KSRRALFGHM 60 SSHSQRAQRA KEEDDARSLS KKQKRVSPEY PKEQVDGALA LMMLSRDQGN WGNGVPGVSD 120 YDDNSLKKKK KKKKKKKKNG SNGLGADAAI NKAGGFQCRV CCKVFGSGQA LGGHWRAHSS 180 RATLRSVDGD DAYFGAQ* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 127 | 133 | KKKKKKK |
| 2 | 127 | 135 | KKKKKKKKK |
| 3 | 127 | 138 | KKKKKKKKKKKK |
| 4 | 128 | 134 | KKKKKKK |
| 5 | 128 | 136 | KKKKKKKKK |
| 6 | 128 | 139 | KKKKKKKKKKKK |
| 7 | 129 | 135 | KKKKKKK |
| 8 | 129 | 137 | KKKKKKKKK |
| 9 | 129 | 140 | KKKKKKKKKKKK |
| 10 | 130 | 136 | KKKKKKK |
| 11 | 130 | 138 | KKKKKKKKK |
| 12 | 131 | 137 | KKKKKKK |
| 13 | 132 | 138 | KKKKKKK |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G35280.1 | 1e-10 | C2H2 family protein | ||||




