![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_03.2883 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | FAR1 | ||||||||
| Protein Properties | Length: 384aa MW: 43224.3 Da PI: 9.6009 | ||||||||
| Description | FAR1 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | FAR1 | 78.2 | 1.6e-24 | 125 | 214 | 1 | 89 |
FAR1 1 kfYneYAkevGFsvrkskskkskrngeitkrtfvCskegkreeekkk.tekerrtraetrtgCkaklkvkkekdgkwevt 79
++Y +YA+ +GF vr++ks++s++++++++r+fvC++eg+++++ + k++r+r +tr gC a+++v ++ +gkw+vt
evm.model.AsparagusV1_03.2883 125 EYYVAYATCIGFGVRMNKSRRSRKDDTVIMRRFVCTREGFHSKRVIYdDGKKKRKRGTTREGCMAMIEVIRKGHGKWVVT 204
69****************************************9987647889999************************* PP
FAR1 80 kleleHnHel 89
kl ++H+H +
evm.model.AsparagusV1_03.2883 205 KLITDHTHMV 214
********86 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 384 aa Download sequence |
MFWWDVADMD SNGSASSMKF FSARKCWASS PSYIDQDSAQ ARSTSLAKVF IAMDGTLSED 60 DGLIRDSHMD LNDSITDPRM ALAFTALGVE LNTTMIPTHL LHMETAEVGE PTIGMEFDSD 120 EAAKEYYVAY ATCIGFGVRM NKSRRSRKDD TVIMRRFVCT REGFHSKRVI YDDGKKKRKR 180 GTTREGCMAM IEVIRKGHGK WVVTKLITDH THMVAIPSKV RPRVDRSMVS SNASLLHGES 240 KQYILKRWTR NATSNVVLDE RVVDSGLSFQ EYLVAWYNDL CLDAVKYGME GATSAEVYKV 300 AKNAIQKAFA EVVGAKNMQR KGQQNNQRFA RMQKMQYKMP LPKLQPKKTS SRVVQHEEAG 360 RSKRNAKEDM LDANDPDLNG GAH* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 144 | 179 | RRSRKDDTVIMRRFVCTREGFHSKRVIYDDGKKKRK |
| 2 | 175 | 200 | KKKRKRGTTREGCMAMIEVIRKGHGK |
| 3 | 176 | 201 | KKKRKRGTTREGCMAMIEVIRKGHGK |
| 4 | 177 | 202 | KKKRKRGTTREGCMAMIEVIRKGHGK |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G07500.1 | 1e-24 | FAR1 family protein | ||||




