![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_04.2576 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | C2H2 | ||||||||
| Protein Properties | Length: 349aa MW: 39794.6 Da PI: 6.9282 | ||||||||
| Description | C2H2 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-C2H2 | 16.9 | 1.7e-05 | 92 | 116 | 1 | 23 |
EEET..TTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCp..dCgksFsrksnLkrHirtH 23
y+C+ Cgk F ++s LkrH tH
evm.model.AsparagusV1_04.2576 92 YVCHydGCGKKFLDSSKLKRHFLTH 116
9********************9998 PP
| |||||||
| 2 | zf-C2H2 | 19.9 | 2e-06 | 122 | 146 | 1 | 23 |
EEET..TTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCp..dCgksFsrksnLkrHirtH 23
+ Cp Cgk Fs nL++H++ H
evm.model.AsparagusV1_04.2576 122 FICPhpGCGKAFSLDFNLRSHMKIH 146
789********************99 PP
| |||||||
| 3 | zf-C2H2 | 15.8 | 4.1e-05 | 152 | 176 | 1 | 23 |
EEET..TTTEEESSHHHHHHHHHHT CS
zf-C2H2 1 ykCp..dCgksFsrksnLkrHirtH 23
++Cp dCgk +++ L+ Hi+ H
evm.model.AsparagusV1_04.2576 152 HVCPykDCGKKYTHENKLNAHIKAH 176
79*********************96 PP
| |||||||
| 4 | zf-C2H2 | 13.7 | 0.00019 | 216 | 241 | 1 | 23 |
EEET..TTTEEESSHHHHHHHHHH.T CS
zf-C2H2 1 ykCp..dCgksFsrksnLkrHirt.H 23
+ Cp Cgk + + + L+ H+++ H
evm.model.AsparagusV1_04.2576 216 FACPyeGCGKDYIHEYKLNLHLKKeH 241
78*********************999 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 349 aa Download sequence |
MRSKAPSAVR WFKDWVPQNL ILSGGECSLL KWVTEDTMQS LKDNQKVPEK QAPEPESTTE 60 VLFLCSYEGC GRTFLDIGTL RKHAHTHGER QYVCHYDGCG KKFLDSSKLK RHFLTHTGER 120 HFICPHPGCG KAFSLDFNLR SHMKIHSPEN YHVCPYKDCG KKYTHENKLN AHIKAHHGKS 180 TGAETVKHST QVLDKIQNAL KNPAALHGSA SSDRPFACPY EGCGKDYIHE YKLNLHLKKE 240 HPDHNLEENG KHHAPTADFD IDESSEQDTL MKKLNVLKSI KRNRPSPIQQ KPPSKVPRQK 300 SSSSAPRDID MVKKSWPIKD MYEEDSEETE EDKEDLENVD DEETEDED* |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G06634.1 | 1e-118 | C2H2 family protein | ||||




