![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_05.522 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | NF-X1 | ||||||||
| Protein Properties | Length: 581aa MW: 65748.9 Da PI: 8.5673 | ||||||||
| Description | NF-X1 family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | zf-NF-X1 | 20.3 | 1.2e-06 | 4 | 23 | 1 | 20 |
zf-NF-X1 1 CGkHkCqklCHeGpCppCpq 20
CG+H+C++ CHeG+C++Cp+
evm.model.AsparagusV1_05.522 4 CGRHRCERGCHEGECGECPL 23
******************95 PP
| |||||||
| 2 | zf-NF-X1 | 20.1 | 1.4e-06 | 132 | 157 | 1 | 20 |
zf-NF-X1 1 CG......kHkCqklCHeGpCppCpq 20
CG +HkC ++CH+G+C pCp+
evm.model.AsparagusV1_05.522 132 CGrklrcnNHKCPSPCHRGDCAPCPL 157
666666669***************95 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 581 aa Download sequence |
MLRCGRHRCE RGCHEGECGE CPLTGRRTCP CGKKEYKGVA CDVEVPNCGS TCEKMLACGR 60 HRCPERCHRG VCVETCRTVV MKGCRCGSLR KEVPCYQDLV CERKCQGTRD CGRHACRRRC 120 CGGDCPSCPE ICGRKLRCNN HKCPSPCHRG DCAPCPLMVS ISCSCGETHF EVPCGVERSQ 180 KPPRCPKQCH ISRLCRHKSE CRPHKCHYGA CPPCKLICGE GLPCGHTCKQ RCHGPIPPPN 240 PEFTLRPKKK QRDRHIESTP GSPCPPCQEV ILIPCRGQHI GEERPMICSR TVQFSCQNLC 300 GYLLLCGNHY CTKACHFLEL TEHEGQEERC EDCFLPCQKV REPPCPHPCP LPCHSNDCPP 360 CKTLIKRTCH CGSMVHVFEC IYYNSLSDKE QQRVRCCVGT CHRKLPKCPH LCSETCHPGE 420 CPSSNQCTKK VTVRCGCNNL KKDWICQDAI NAYKKAGRDP KDITKTQFGV GLLACNEDCR 480 SKIKVVDSEP QLRKAKVTQS VVVDAEKVPK RRKRREKVRD IRNASKFQAI KQTVWRYFLL 540 LLICLVISAI AYYGYKGIFL LSDWMNKIEE KQQRRRYPRV * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 246 | 252 | RPKKKQR |
| 2 | 507 | 513 | KVPKRRK |
| 3 | 509 | 515 | PKRRKRR |
| 4 | 511 | 517 | RRKRREK |
| 5 | 512 | 518 | RRKRREK |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT5G05660.1 | 0.0 | NF-X1 family protein | ||||




