PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_06.1813 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | ERF | ||||||||
| Protein Properties | Length: 167aa MW: 18846.1 Da PI: 5.4832 | ||||||||
| Description | ERF family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | AP2 | 64.9 | 1.6e-20 | 52 | 102 | 1 | 55 |
AP2 1 sgykGVrwdkkrgrWvAeIrdpsengkr.krfslgkfgtaeeAakaaiaarkkleg 55
s y+GVr+++ +g+W+AeIrdp + r +lg+f+taeeAa+a+++a+ +++g
evm.model.AsparagusV1_06.1813 52 SEYRGVRRRP-WGKWAAEIRDPL----KaVRKWLGTFDTAEEAARAYDKAAIEFRG 102
569*******.**********73....46************************998 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 167 aa Download sequence |
MDPTVISSFG SNSGCLGCEF FASGELIREV KSSSSSLIEP KIKKRRKKPK TSEYRGVRRR 60 PWGKWAAEIR DPLKAVRKWL GTFDTAEEAA RAYDKAAIEF RGARAKLNFP FPEQEQHQEK 120 ENENEPSDEL KFPTLSEGSS VEKETGEERT TVGLWDGLPD LFEIDF* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 40 | 46 | PKIKKRR |
| 2 | 43 | 47 | KKRRK |
| 3 | 43 | 48 | KKRRKK |
| 4 | 43 | 60 | KKRRKKPKTSEYRGVRRR |
| 5 | 43 | 61 | KKRRKKPKTSEYRGVRRRP |
| 6 | 44 | 61 | KKRRKKPKTSEYRGVRRR |
| 7 | 44 | 62 | KKRRKKPKTSEYRGVRRRP |
| 8 | 45 | 63 | KKRRKKPKTSEYRGVRRRP |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT2G33710.1 | 7e-21 | ERF family protein | ||||