![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_07.555 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | bHLH | ||||||||
| Protein Properties | Length: 222aa MW: 24925.1 Da PI: 8.488 | ||||||||
| Description | bHLH family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | HLH | 20.9 | 6.3e-07 | 178 | 202 | 7 | 30 |
HHHHHHHHHHHHHHHHHHCTSCC.C CS
HLH 7 erErrRRdriNsafeeLrellPk.a 30
+ ErrRR+++N+++ Lr+++Pk +
evm.model.AsparagusV1_07.555 178 MSERRRRKKLNDRLYMLRSVVPKiS 202
68********************944 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 222 aa Download sequence |
MSITYPSLSS LSSQLVSNVA VLNLFTVVTK RRNIKRMNSN WYLTEPLQNH QESFSSLLST 60 NPFGLDPFGL TAPLSFTDLN PTAQFQTTHL HETGFQAFET PKFVSGSKIL RPAEANPSIG 120 AQPTLIGEEN EEEGVEDGSF DGSGLNCEFE ENVKSLENNE SHESRRKRNR AAPAKNLMSE 180 RRRRKKLNDR LYMLRSVVPK ISKVRDAVLN SLCFRCWDLS L* |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 165 | 186 | RRKRNRAAPAKNLMSERRRRKK |
| 2 | 166 | 186 | RKRNRAAPAKNLMSERRRRKK |
| 3 | 166 | 187 | RRKRNRAAPAKNLMSERRRRKK |
| 4 | 180 | 187 | ERRRRKKL |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT3G26744.1 | 7e-14 | bHLH family protein | ||||




