![]() |
PlantRegMap/PlantTFDB v5.0
Plant Transcription
Factor Database
|
| Home TFext BLAST Prediction Download Help About Links PlantRegMap |
Transcription Factor Information
| Basic Information? help Back to Top | |||||||||
|---|---|---|---|---|---|---|---|---|---|
| TF ID | evm.model.AsparagusV1_08.1167 | ||||||||
| Organism | |||||||||
| Taxonomic ID | |||||||||
| Taxonomic Lineage |
cellular organisms; Eukaryota; Viridiplantae; Streptophyta; Streptophytina; Embryophyta; Tracheophyta; Euphyllophyta; Spermatophyta; Magnoliophyta; Mesangiospermae; Liliopsida; Petrosaviidae; Asparagales; Asparagaceae; Asparagoideae; Asparagus
|
||||||||
| Family | HD-ZIP | ||||||||
| Protein Properties | Length: 211aa MW: 23963.1 Da PI: 8.1702 | ||||||||
| Description | HD-ZIP family protein | ||||||||
| Gene Model |
|
||||||||
| Signature Domain? help Back to Top | |||||||
|---|---|---|---|---|---|---|---|
| No. | Domain | Score | E-value | Start | End | HMM Start | HMM End |
| 1 | Homeobox | 60.1 | 3.6e-19 | 51 | 105 | 3 | 57 |
--SS--HHHHHHHHHHHHHSSS--HHHHHHHHHHCTS-HHHHHHHHHHHHHHHHC CS
Homeobox 3 kRttftkeqleeLeelFeknrypsaeereeLAkklgLterqVkvWFqNrRakekk 57
k++++++eql+ Le F ++r++ ++ +LA+klgL+ +qV vWFqNrRa++k+
evm.model.AsparagusV1_08.1167 51 KKRRLSDEQLRFLEINFGEERKLESGRKMQLASKLGLDPKQVAVWFQNRRARWKN 105
66789************************************************95 PP
| |||||||
| 2 | HD-ZIP_I/II | 118 | 5.1e-38 | 51 | 142 | 2 | 93 |
HD-ZIP_I/II 2 kkrrlskeqvklLEesFeeeekLeperKvelareLglqprqvavWFqnrRARtktkqlEkdyeaLkraydalkeenerLe 81
kkrrls+eq+++LE +F ee+kLe+ rK++la++Lgl+p+qvavWFqnrRAR+k+kq+E++y +Lk+++d+++ e+++Le
evm.model.AsparagusV1_08.1167 51 KKRRLSDEQLRFLEINFGEERKLESGRKMQLASKLGLDPKQVAVWFQNRRARWKNKQMEEEYLKLKTKLDSVVVEKCHLE 130
9******************************************************************************* PP
HD-ZIP_I/II 82 keveeLreelke 93
+ev +L+e+l+e
evm.model.AsparagusV1_08.1167 131 NEVLSLKERLSE 142
*******99976 PP
| |||||||
| Sequence ? help Back to Top |
|---|
| Protein Sequence Length: 211 aa Download sequence |
MIKQVLEEKM LFSSAPSSEL YTSIPQGDQR RTRRRRRRAK VDSDGLSAES KKRRLSDEQL 60 RFLEINFGEE RKLESGRKMQ LASKLGLDPK QVAVWFQNRR ARWKNKQMEE EYLKLKTKLD 120 SVVVEKCHLE NEVLSLKERL SEAEEKIKRL SKGGDGGADD GGSPSSSSTE TYQPPPPPPA 180 ALGEFGEMGD ELLYINEDNC VIDYGYLFGM * |
| Nucleic Localization Signal ? help Back to Top | |||
|---|---|---|---|
| No. | Start | End | Sequence |
| 1 | 30 | 37 | RRTRRRRR |
| 2 | 30 | 38 | RRTRRRRRR |
| 3 | 33 | 38 | RRRRRR |
| 4 | 33 | 54 | RRRRRRAKVDSDGLSAESKKRR |
| 5 | 34 | 55 | RRRRRRAKVDSDGLSAESKKRR |
| 6 | 35 | 56 | RRRRRRAKVDSDGLSAESKKRR |
| 7 | 36 | 57 | RRRRRRAKVDSDGLSAESKKRR |
| 8 | 99 | 107 | RRARWKNKQ |
| Best hit in Arabidopsis thaliana ? help Back to Top | ||||||
|---|---|---|---|---|---|---|
| Hit ID | E-value | Description | ||||
| AT4G36740.1 | 6e-44 | HD-ZIP family protein | ||||




